12
G9000 80-225kVA TOSHIBA SYNC KIT Installation Manual
– 94469-001
Figure 5-c. Installation procedure for SLAVE UPS (3)
Figure 6-2: Installation procedure for SLAVE UPS (4)
TN1
IO1 PCB
(IOAU-09*)
13
14
Part No. 17
Wire (Jumper)
The terminal of TN1
on IO1 PCB (IOAU-09*)
UP1 PCB
(UPGR-M*) CN50
Part No. 6
Flat cable
* Use part no.13
Four (4) screws (M5) with
spring washer and flat washer for
the assembly
VS1 PCB
(VSAU-16*) CN1
Field-installed wirings
From MASTER UPS