G9000 80-225kVA TOSHIBA SYNC KIT Installation Manual
– 94469-001
11
Figure 5-a. Installation procedure for SLAVE UPS (1)
Figure 6-1: Installation procedure for SLAVE UPS (2)
Part No. 2
Mounting Metallic Plate
Part No. 4
Fuses holder
Part No. 3
Three (3) Fuses
* Use part No.12
two (2) screws (M4) with spring washer
and flat washer for the Fuse holder
Part No. 5
Four (4) Supporters
* Use part No.14, No.15
Four (4) flat washers
Four (4) spring washers
Part No. 16
Fuse label
Part No. 9
Wire
Part No. 1
VS1 PCB (VSAU-16*)
Part No. 8
Wire
UN - V
VN - W
WN - U
Part No. 7
Wire (3-twisted)
U - U
V - V
W - W
A
B
C
* Use part No.11
one (1) screw(M3) with spring washer
and flat washer for grounding.
* Use part No.11
four (4) screws(M3) with spring washer
and flat washer for VS1 PCB.
From MASTER UPS
To UP1 PCB (UPGR-M*)
CN1
U
V
W