
November 2003 © TOSHIBA TEC
4 - 7
e-STUDIO3511/4511 PREVENTIVE MAINTENANCE
4.2 General Descriptions for PM Procedure
(1)
Preparation
a. Ask the user about the current conditions of the equipment and note them down.
b. Before starting maintenance, make some sample copies and store them.
c. See the replacement record and check the parts to be replaced in the PM support mode (6S-
2) or list printing mode (9S-103).
6S-2
: [6]+[START]+[POWER]ON
g
[2]
g
[START]
9S-103 : [9]+[START]+[POWER]ON
g
[103]
g
[START]
PM SUPPORT CODE LIST
10-20-'03 11:28
UNIT
OUTPUT PAGES/
PM OUTPUT PAGE/
DRIVE COUNTS
PM DRIVE COUNTS
DEVELOP COUNTS
DEVELOP COUNTS
DRUM
22220
200000
30948
320000
DRUM BLADE
22220
200000
30948
320000
DRUM BRUSH
22220
200000
30948
320000
GRID
22220
200000
30948
320000
MAIN CHARGER WIRE
22220
200000
30948
320000
WIRE CLEANING PAD
22220
200000
30948
320000
Fig. 4-201
d. Turn OFF the power and make sure to unplug the equipment.
(2)
Perform a preventive maintenance using the following checklist and illustrations. Refer to the
Service Manual if necessary.
(3)
Plug in the equipment after the maintenance has been finished. Then turn ON the power and
make some copies to confirm that the equipment is working properly.
4.3 Operational Items in Overhauling
Overhaul each equipment with the following timing.
•
e-STUDIO3511:
When the number of develop counts has reached 360,000 or 2.5 years have passed
form the start of use (Whichever is earlier.)
•
e-STUDIO4511:
When the number of develop counts has reached 450,000 or 2.5 years have passed
form the start of use (Whichever is earlier.)
(1)
Replace all the supplies.
(2)
Check the components in the drive section (gears, pulleys, timing belts, etc.). Replace them with
new ones if they are damaged.
(3)
Check all the adhesives such as tape and Mylar if they are damaged or have become unstuck.
Replace them with new ones if necessary.
(4)
Check the performance of all the switches and sensors. Replace them with new ones if neces-
sary.
(5)
Clean inside the equipment thoroughly.
Содержание e-STUDIO3511
Страница 2: ... 2003 TOSHIBA TEC CORPORATION All rights reserved ...
Страница 10: ...e STUDIO3511 4511 CONTENTS vi November 2003 TOSHIBA TEC ...
Страница 12: ......
Страница 20: ...e STUDIO3511 4511 SPECIFICATIONS 1 8 November 2003 TOSHIBA TEC ...
Страница 190: ...e STUDIO3511 4511 ERROR CODE AND SELF DIAGNOSTIC MODE 2 170 November 2003 TOSHIBA TEC ...
Страница 423: ...November 2003 TOSHIBA TEC 5 109 e STUDIO3511 4511 TROUBLESHOOTING 4 Background fogging Fig 5 205 ...
Страница 425: ...November 2003 TOSHIBA TEC 5 111 e STUDIO3511 4511 TROUBLESHOOTING A B 5 Moire lack of sharpness Fig 5 206 ...
Страница 430: ...e STUDIO3511 4511 TROUBLESHOOTING 5 116 November 2003 TOSHIBA TEC 9 Blank print Feeding direction Fig 5 210 ...
Страница 456: ...e STUDIO3511 4511 TROUBLESHOOTING 5 142 November 2003 TOSHIBA TEC ...
Страница 518: ...e STUDIO3511 4511 FIRMWARE UPDATING 6 62 November 2003 TOSHIBA TEC ...
Страница 546: ...e STUDIO3511 4511 REMOTE SERVICE 8 24 November 2003 TOSHIBA TEC 7 ...
Страница 548: ...e STUDIO3511 4511 WIRE HARNESS CONNECTION DIAGRAMS 9 2 November 2003 TOSHIBA TEC ...
Страница 551: ......
Страница 552: ...2 17 2 HIGASHIGOTANDA SHINAGAWA KU TOKYO 141 8664 JAPAN ...