Figure 56
1.
Clutch pulley
5.
Square hole in the idler
arm for the ratchet
2.
Mower belt
6.
Idler grease zerk
3.
Spring loaded idler pulley
7.
Belt guide
4.
Ratchet
10.
Install the belt guide on the idler arm shown in
Figure 56.
11.
Using the ratchet in the square hole, install the idler
spring (Figure 56).
Make sure the spring ends are seated in the anchor
grooves.
12.
Install the belt covers (Figure 57).
g017496
Figure 57
1.
Position the belt cover
3.
Install the bolt
2.
Slide belt cover under the
side catches
Replacing the Hydraulic Pump
Drive Belt
1.
Disengage the PTO and set the parking brake.
2.
Stop the engine, remove the key, and wait for all moving
parts to stop before leaving the operating position.
3.
Remove the mower belt. Refer to Replacing the Mower
Belt in Maintenance.
4.
Raise the machine and support it with jack stands
(Figure 59).
5.
Remove the clutch stop shown in Figure 58.
g017494
1
Figure 58
1.
Clutch stop
6.
Remove the idler spring from the post (Figure 59).
7.
Remove the existing belt from the hydraulic unit drive
pulleys and the engine pulley
8.
Install the new belt around the engine pulley and the
two drive pulleys.
41
Содержание Z Master Commercial 2000 74141TE
Страница 56: ...Schematics g018479 Wire Diagram Rev A 56 ...
Страница 57: ...Notes 57 ...
Страница 58: ...Notes 58 ...