![Toro Reelmaster 2000 Скачать руководство пользователя страница 38](http://html.mh-extra.com/html/toro/reelmaster-2000/reelmaster-2000_operators-manual_1132156038.webp)
Removing the Hood
Remove the hood to ease maintenance procedures in the
engine area of the machine, as follows:
1. Unlatch and raise the hood.
2. Remove the cotter pin securing the hood pivot to
the mounting brackets (Figure 36).
Figure 36
1.
Cotter pin
3. Slide the hood to the right side, lift the other side,
and pull it out of the brackets.
4. Reverse the procedure to install the hood.
Lubrication
Greasing the Bearings and
Bushings
Service Interval:
Every 50 hours (Grease immediately
after every washing regardless of the
interval listed.)
Lubricate all grease fittings for the bearings and bushings
with No. 2 General Purpose Lithium Base Grease.
Lubricate bearings and bushings
immediately
after
every washing, regardless of the interval listed.
The grease fitting locations and quantities are as follows:
•
Steering column (Figure 37)
Figure 37
•
Steering gears (2) (under the skirt below the steering
sector) and the steering shaft (2) (Figure 38)
Figure 38
38
Содержание Reelmaster 2000
Страница 9: ...104 3991 9 ...
Страница 11: ...115 3037 11 ...
Страница 53: ...Schematics G009907 Electrical Schematic Rev A 53 ...
Страница 54: ...G009977 Hydraulic Schematic Rev A 54 ...
Страница 55: ...G009978 Hydraulic Schematic with 3 Wheel Drive Kit Installed Rev A 55 ...