G009853
1
2
Figure 5
1.
Lift arm
2.
Pivot rod
2. Secure the pivot rod to the lift arm with a bolt (5/16
x 7/8 inch) and lock washer.
3. Loosen the top bolt securing the left counterbalance
arm to the frame (Figure 6).
G009854
1
2
3
4
5
8
6
7
Figure 6
1.
Counterbalance arm
5.
Tipper chain
2.
Top bolt
6.
Lift chain
3.
Bottom bolt
7.
Cylinder pin
4.
Lift arm pivot pin
8.
Lift arm tab
4. Remove the bottom bolt and nut securing the left
counterbalance arm to the frame (Figure 6).
5. Rotate the counterbalance arm outward and remove
the lift arm pivot pin and tipper chain (Figure 6).
6. Position the lift arm between the frame members,
align the mounting holes, and install the pivot
pin (Figure 6). Insert the pivot pin so that the
counterbalance arm fits into the slot in the pin. Do
not secure the counterbalance arm at this time.
7. Secure one end of the lift chain to the lift cylinder
pin with a clevis pin and cotter pin.
8. Secure the other end of the lift chain to the hole
in the lift arm mounting tab with clevis pins and
cotter pins. Use the appropriate hole in the lift arm
as designated in Figure 7.
G009855
2
1
Figure 7
1.
27 inch cutting unit (inner
hole)
2.
32 inch cutting unit (outer
hole)
9. Repeat the procedure on the right-hand lift arm.
5
Mounting the Cutting Unit
Drive Motors
No Parts Required
Procedure
1. Position the cutting units in front of the pivot rods.
2. Remove the bearing housing cover (Figure 4) from
the inside end of the right-hand cutting unit. Install
the cover and gasket (supplied with the cutting unit)
on the outside end. Locate the spider coupling
(Figure 8) shipped in the bearing housing.
15
Содержание Reelmaster 2000
Страница 9: ...104 3991 9 ...
Страница 11: ...115 3037 11 ...
Страница 53: ...Schematics G009907 Electrical Schematic Rev A 53 ...
Страница 54: ...G009977 Hydraulic Schematic Rev A 54 ...
Страница 55: ...G009978 Hydraulic Schematic with 3 Wheel Drive Kit Installed Rev A 55 ...