12
Setup
Note: Determine the left and right sides of the machine
from the normal operating position.
Loose Parts
Note: Use the chart below to verify all parts have been shipped.
DESCRIPTION
QTY.
USE
Caster assemblies
Bolt, 3/8 x 3/4 in.
Flange nut, 3/8 in.
2
8
8
Installing the front casters
Upper handle
Bolt, 3/8 x 1 in.
Locknut, 3/8 in.
Plastic terminal
Wire tie
1
4
4
1
1
Installing the upper handle and wire harness
Rod fitting
Clevis pin
Washer, 1/4 in.
Hairpin cotter
2
2
2
4
Installing the traction control rods
PTO rod
Hairpin cotter
1
2
Installing the PTO rod
Shift lever
Rubber seal
Square hole washer
Spring washer
Locknut
1
1
1
1
1
Installing the shift lever
Fuel tank
Bolt, 5/16 x 7/8 in.
Lock washer, 5/16 in.
Washer, 5/16 in.
Stud
Spring
Hose clamp
1
2
2
4
2
2
1
Installing the fuel tank
Operator’s Manual
Engine Operator’s Manual
Parts Catalog
Registration card
1
1
1
1
Read before operating machine
Fill out and return to Toro