Procedure
Description
Qty.
Use
16
No parts required
–
Remove the storage stands.
Lock plate
2
Tap bolt
2
17
Retaining ring
2
Install the latch lock.
CE decal
1
18
Production year decal
1
Apply the CE decal and the production
year decal.
Media and Additional Parts
Description
Qty.
Use
Operator's Manual
1
Read before operating the aerator
Spring wires (SR54 and SR54-S)
6
Replacement spring wires
Spring wires (SR70 and SR70-S)
8
Replacement spring wires
Spring wires (SR72)
4
Replacement spring wires
Spring wires (SR72)
2
Replacement spring wires
PTO Operators Manual
1
Read before operating the aerator
1
Removing the Aerator from
the Crating
No Parts Required
Procedure
1.
Remove the aerator from the crating.
2.
Remove the bolts securing the aerator storage
stands to the shipping pallet and remove the
aerator from the pallet.
3.
Remove the storage stands from the aerator.
Retain them for storage use.
Note:
The SR54-S and the SR70-S do not
have shipping stands.
4.
Place the aerator on a flat, level surface with the
front roller on the ground and a block of wood
positioned under the heads.
2
Connecting the Lower Link
Arms
Parts needed for this procedure:
2
Hitch pin
2
Lynch pin
Procedure
1.
Ensure that the PTO is disengaged.
2.
Back the traction unit squarely to the aerator
until the lower link arms align with the mounting
brackets.
Note:
The aerator gearbox shaft should align
with the traction unit PTO shaft (centered on the
traction unit). If shafts misalign, adjust the lower
link arms, from side to side until the shafts align.
3.
Engage the parking brake, shut off the engine,
and remove the key. Wait for the engine and
all moving parts to stop before leaving the
operator's seat.
Note:
For maximum ground clearance, secure
the hitch pins in the aerator at the lower mounting
bracket holes, when so equipped. To determine
8