background image

Field Wire Installation

 CAUTION: The Network VP satellite is 

capable of operating up to 32 stations 

and the pump/master valve circuit 

concurrently. To prevent possible 

controller damage, total current load for all 

field outputs operating concurrently must 

not to exceed 3.2A. If more than one valve 

per station is required, calculate the total 

in-rush current load which would be 

imposed in the maximum operating 

conditions and use this value as a guide 

during installation and operation of the 

controller.

Procedure

1. Attach the control and common wires to 

each valve and/or valve-in-head solenoid 

leads using an approved waterproof splicing 

method. Route the wires into the controller 

cabinet through the 3” (76mm) conduit.

2. If automatic pump start is required, refer to 

the applicable wiring diagram in Figure 7 and install 

accordingly.

 CAUTION: Do not connect the pump starter 

directly to the controller’s pump start circuit. 

Damage to the controller will result. 

Note: The pump circuit can also be utilized to control a 

master valve if required.

3. Secure the field common wire(s) and pump start relay 

(or master valve) wire to the appropriate terminals 

on the Pump/Com module OR (optional) Pump/Com 

Surge Protection module. See Figure 8.

4. Momentarily touch each valve control wire to the 

Hot Post to activate and identify the corresponding 

valve(s).

5. Secure the valve control wires to the station terminals 

in the preferred order of operating sequence. Station 

terminals are numbered left to right, 1–32 (front) and 

33–64 (back). See Figure 9.

Note: A 3-position switch is provided on the Pump/Com 

module for additional control of the pump relay circuit. 

In addition, the optional station terminal modules 

with optional control switches have one switch for 

each station output. See Figures 8 and 9. The three switch 

positions control the circuits as follows:

On – Manually activates the circuit. The pump or station will 

remain on until the switch is moved to the Auto or Off position.

Off – Switches the circuit off, preventing pump or station 

operation from the satellite.

Auto – The circuit is automatically activated by the controller 

during automatic or manual watering operation.

As an added lightning protection measure, the field common 

circuit is normally open when the controller is inactive. 

Therefore, to use the field output control switches for manual 

operation, the common circuit must be engaged first.  

Press the Field Common Engage push button switch to 

activate the circuit. The Field Common Indicator Lamp will 

turn on when the circuit is active. The common circuit will 

automatically disconnect upon completion of an automatic or 

manually activated watering operation initiated through the 

timing mechanism. The circuit can also be disconnected by 

momentarily switching the power supply off. 

 CAUTION: To prevent damage to the 3.2A field output circuit fuse,  

do not exceed 3.2A load when manually activating multiple field outputs. 

1

PUMP

COMMON

PUMP

COMMON

ON

AUTO

OFF

Figure 8

Pump/Com Module

Optional Pump/Com & 

Communication Surge 

Protection Module

 Field Common  

 Terminals

 Field Common  

 Terminals 

 Pump  

 Terminal

 Pump  

 Terminal

Pump Circuit 

Switch

Field Common 

Engage Switch

Multiple Controllers

Single Controller

Pressure Switch With 

Controller Override

Starter 

Power 

Source

Starter 

Power 

Source

Starter 

Power 

Source

Pump Power 

Source

Pressure Switch Pump Power 

Source

Pump Power 

Source

Relay  

24 VAC 

.75A Max.

Relay  

24 VAC 

.75A Max. 

(Typical)

Relay  

24 VAC 

.75A Max.

Pump

Pump

Pump

Pump

Pump

Pump

Pump

Com

Com

Com

Com

Magnetic 

Pump 

Starter

Magnetic 

Pump 

Starter

Mag. 

Pump 

Starter

To Other 

Controllers

Figure 7

Station Output Control 

Switches (Optional) 

Hot Post

Standard 

Terminal Block

Surge Protection Terminal 

Block (Optional) 

Figure 9

3-Amp Fuse

1-Amp Fuse

Station Output Terminals

Station Output Terminals

Содержание Network VP

Страница 1: ...a new frequency Leave power output setting to low The procedure to program the narrow band radio with a new frequency is similar to the Toro s Sentinel radio Use the Sentinel Radio Programming kit P...

Страница 2: ...concrete into the formed foundation hole Press the mounting bolt positioner into the concrete until it is flush and level with the foundation surface and aligned with the conduit 7 Finish the concrete...

Страница 3: ...2 Using a 5 8 17 mm clamp or Cad weld fastener attach a 6 AWG 10 mm2 solid copper wire near the top of the ground rod Avoiding wire bends of less than 8 20 3 cm radius and more than 90 route the wire...

Страница 4: ...e 6 6 Reinstall the power supply assembly cover 7 Apply power to the controller Note The Network VP satellite incorporates a 24 VAC Hot Post feature on each station output module which enables control...

Страница 5: ...witch positions control the circuits as follows On Manually activates the circuit The pump or station will remain on until the switch is moved to the Auto or Off position Off Switches the circuit off...

Страница 6: ...tion practice Procedure 1 Starting at the SPU route the communication comm cable to each satellite leaving enough cable at each location to enable connection See Figure 10 Note If additional communica...

Страница 7: ...ardware Features Plastic or Painted Stainless Steel Cabinetry Front Back and Top Locking Covers Removable Station Output and Common Pump Modules Modular Station Output 16 to 64 stations in 8 station i...

Страница 8: ...rgy and if not installed and used in accordance with the instruction manual may cause harmful interference to the radio communications Operation in a residential area is likely to cause harmful interf...

Страница 9: ...Deje la configuraci n la potencia de salida en un nivel bajo El procedimiento para programar la radio de banda angosta con una frecuencia nueva es similar al de la radio Sentlnel de Toro Para este pr...

Страница 10: ...miento con concreto Presione el posicionador del perno de montaje en el concreto hasta que quede al ras y nivelado con la superficie del cimiento y alineado con el conducto 7 Alise y nivele el concret...

Страница 11: ...obre s lido 6WG 10 mm2 de secci n cerca del tope del electrodo de conexi n a tierra con una abrazadera o un broche soldado con CAD Cartridge Actuated Device Dispositivo de Soldadura por Ignici n de 17...

Страница 12: ...en la Figura 6 6 Coloque la tapa del ensamblaje de la fuente de alimentaci n 7 Alimente el controlador Nota El sat lite de Red VP tiene una funci n Hot Post de 24 VCA en el m dulo de salida de cada es...

Страница 13: ...ida hasta que la palanca del interruptor sea colocada en la posici n de Auto o Apagado OFF Off Apaga el circuito impidiendo que el sat lite opere la bomba o la estaci n Auto El circuito es activado au...

Страница 14: ...ando por la SPU encamine el cable de comunicaciones com a cada sat lite dejando suficiente cable en cada lugar para facilitar la conexi n Vea la Figura 10 Nota Si se tienden cables de comunicaciones a...

Страница 15: ...o inoxidable pintado Tapas frontal posterior y superior con trabas M dulos de salida de estaci n y com n bomba de quita y pon Salida de estaci n modular 16 a 64 estaciones en incrementos de 8 estacion...

Страница 16: ...o se lo instala y se usa de acuerdo con el manual de instruccionrd puede causar interferencias perjudiciales a las radiocomunicaciones Lo m s posible es que la operaci n en un rea residencial cause in...

Страница 17: ...mentaire peut tre programm e dans le module radio du satellite Network VP Laisser le r glage de la puissance de sortie sur faible puissance La proc dure suivre pour programmer une nouvelle fr quence...

Страница 18: ...la surface sup rieure du gabarit de 51 mm 6 Couler le b ton dans le coffrage de la fondation Enfoncer le gabarit de positionnement des boulons dans le b ton jusqu ce qu il soit niveau par rapport la...

Страница 19: ...r la Figure 4 2 Avec un collier de 17 mm ou une attache de type Cad weld attacher un fil de cuivre massif de 10 mm2 6 AWG vers le haut de la tige de mise la terre En vitant toute courbe d un rayon inf...

Страница 20: ...alimentation 7 Remettre le programmateur sous tension Remarque Le satellite Network VP est quip sur chaque module de sortie d une fonctionnalit Hot Post 24 V c a qui permet l identification des lectro...

Страница 21: ...cteur d activation par poste Voir les Figures 8 et 9 Le s lecteur trois positions commande les circuits comme suit Marche ON active manuellement le circuit La pompe ou le poste reste en marche jusqu c...

Страница 22: ...le c ble de communication Com de l unit de protection anti surtension chaque satellite en pr voyant une longueur suffisante de c ble chaque emplacement pour permettre les connexions Voir la Figure 10...

Страница 23: ...ique ou en acier inoxydable peint Panneaux avant arri re et du dessus verrouillables Modules Sortie poste et Commun Pompe amovibles Sortie poste modulaire 16 64 postes par incr ments de 8 postes Modul...

Страница 24: ...ences et s il n est pas install et utilis conform ment aux instructions du manuel il peut brouiller les communications radio L utilisation de cet quipement en zone r sidentielle provoquera vraisemblab...

Страница 25: ...mmierung des Schmalband Funkger ts auf eine neue Frequenz erfolgt auf hnliche Weise wie beim Sentinel Funkger t von Toro Verwenden Sie f r dieses Verfahren das Programmierkit f r das Sentinel Funkger...

Страница 26: ...agen 6 Gie en Sie Beton in das verschalte Fundamentloch Dr cken Sie den Befestigungsschrauben Positionierer in den Beton bis dieser b ndig mit der Fundamentoberfl che und auf den Kabelkanal ausgericht...

Страница 27: ...10 mm2 6 AWG mithilfe einer Klammer mit 17 mm 0 625 Zoll Durchmesser oder einer geschwei ten Halterung im oberen Bereich des Erdungsstabs Ziehen Sie den Draht durch den Kabelkanal bis in den Schrank V...

Страница 28: ...ugruppe wieder 7 Schalten Sie die Spannungszufuhr zur Steuerung ein Hinweis Das Network VP Satellite verf gt an jedem Stations Ausgangsmodul ber einen spannungsf hrenden Stab mit 24 V Wechsel spannung...

Страница 29: ...tiviert den Stromkreis manuell Die Pumpe bzw Station bleibt eingeschaltet bis der Schalter auf Automatisch Auto oder Aus Off geschaltet wird Aus Off Schaltet den Stromkreis aus verhindert den Betrieb...

Страница 30: ...nstallationsmethode Arbeitsablauf 1 Leiten Sie das Kommunikationskabel COMM beginnend an der SPU zu jedem der Satellite Ger te und lassen Sie dabei an jedem Ende genug Kabel zum Kabelanschluss Siehe A...

Страница 31: ...ndaten Plastik bzw Edelstahlschr nke Verriegelnde vordere hintere und obere Abdeckungen Abnehmbare Module f r Stationsausg nge und gemeinsame Kabel Pumpe Modularer Stationsausgang 16 bis 64 Stationen...

Страница 32: ...h nicht in bereinstimmung mit allen Anweisungen erfolgen k nnen m glicherweise St rungen bei Funk bertragungen auftreten Der Betrieb in Wohngebieten verursacht mit gro er Wahrscheinlichkeit St rungen...

Страница 33: ...azione della potenza in uscita su un valore basso La procedura di programmazione del modulo radio a banda stretta con una nuova frequenza simile a quella per il modulo radio Sentinel Toro Si consiglia...

Страница 34: ...oro Premere il posizionatore nel cemento finch non sia livellato rispetto alla superficie dello zoccolo e allineato alla canaletta 7 Rifinire la superficie dicemento creando un area piana e livellata...

Страница 35: ...parte superiore del puntale di terra Evitando che i cavi abbiano un raggio di curvatura minore di 20 3 cm 8 pollici e che la curvatura dei cavi formi un angolo superiore ai 90 instradare il cavo attr...

Страница 36: ...na Nota il satellite incorpora un terminale sotto tensione a 24 V CA su ciascun modulo di uscita della stazione che consente l identificazione delle valvole di controllo tramite l attivazione momentan...

Страница 37: ...ttore controllano i circuiti come segue On Attiva manualmente il circuito La pompa o la stazione resta attiva finch l interruttore non viene spostato nella posizione Auto o Off Off Disattiva il circui...

Страница 38: ...cuna posizione per attivare la connessione Vedere la Figura 10 Nota se installato un ulteriore cavo di comunicazione per una futura espansione del sistema collegare un resistore di 600 ohm attraverso...

Страница 39: ...niciato o in plastica Coperchi anteriore posteriore e superiore Moduli pompa comune e di uscita della stazione rimovibili Uscita della stazione modulare da 16 a 64 stazioni in incrementi di 8 stazioni...

Страница 40: ...fondere energia di radiofrequenza e se non installata e utilizzata attenendosi al manuale di istruzione pu causare interferenze pericolose nelle comunicazioni radio Il funzionamento in un area residen...

Отзывы: