Figure 82
1.
Outer boom section
4.
Hose clamp
2.
Supply hose (outer-boom
section)
5.
R-clamp
3.
Barbed T-fitting
4.
Assemble the right boom-supply hose onto the
T-fitting at the right-boom section (
5.
Secure the hose to the T-fitting with a hose clamp that
you removed in step
of
.
6.
Repeat steps
through
for the left boom-supply hose
at the left-boom section.
17
Installing the Shutoff Valve
and Hoses for the Optional
Spray Gun Kit or Electric
Hose-Reel Kit
Parts needed for this procedure:
1
Cap and retrainer
1
Straight barbed fitting (1/2 inch)
1
Quick-connect fitting (socket)
2
Hose clamp 13 to 32 mm (1/2 to 1-1/4 inches)
1
Hose—1.3 x 762 cm (1/2 x 300 inches)
1
Hose—1.3 x 180 cm (1/2 x 83 inches)
2
2412-36 Hose clamp 6 to 11 mm (1/4 to 7/16 inch)
1
Bypass shutoff valve
1
Section bypass hose—2.5 x 146 cm (1 x 57-1/2
inches)
Repositioning the Section Bypass
Valves
1.
Remove the retainer that secures the plug to the
socketed quick-connect fitting of the bypass manifold
(
).
Note:
Retain the retainer for installation in
the Section Bypass Hose—Machines with the Optional
Spray Gun Kit or the Optional Electric Hose Reel Kit
(page 46)
.
40
Содержание 136-0372
Страница 61: ...Schematics Flow Diagram Rev A 61...
Страница 62: ...Notes...
Страница 63: ...Notes...
Страница 64: ......