background image

2

1

Figure 5

1. Deflector

7.

Mount chute assembly to discharge opening with a

pivot rod, (2) flat washers and cotter pins. Position

components as shown in figure 6.

1

Figure 6

1. Pivot rod

8.

Hook spring onto eye bolt and spring mount bracket

(Fig. 3 & 4).

9.

Measure, mark and cut off handle tube to required

length for specific blower application.

Amount to cut off handle tube:

SandPro – 20 to 24 inches

Groundsmaster 200 Blower – 10 to 12 inches

Groundsmaster 300 Blower – 10 to 12 inches

GroundsPro 2000 Blower – None

Cut to length

1

Figure 7

1. Handle

10.

Slide handle tube into handle support and loosely

secure with (2) U–bolts, washers and nut (Fig. 8).

1

2

Figure 8

1. Handle tube

2. Handle support

11.

Mount handle assembly to blower mounting tabs with

a washer and cotter pin (Fig. 9).

1

2

Figure 9

1. Handle assembly

2. Linkage rod

12.

Mount linkage rod to handle assembly with a washer

and cotter pin (Fig. 9).

13.

Mount linkage rod to deflector assembly with a washer

and cotter pin (Fig. 10).

1

Figure 10

1. Linkage rod

Отзывы: