weights and securing it with the nut; refer to the
Light
Kit Installation Instructions
.
Installing the Rake to the
Machine
Connecting the Chains to the
Attachment Lift
1.
Slide the drawbar under the rear of the machine.
2.
Route the chains
under
the cables.
3.
Install a shackle on the end of each lift chain.
Important:
Ensure that the chains are not twisted.
4.
Align each shackle to the appropriate side of the
attachment lift on the machine (Figure 14).
A
B
G023744
Figure 14
5.
Secure each shackle with a flange locknut (5/16 inch)
and a bolt (5/16 x 2-1/2 inches).
Note:
Ensure that the threads of each bolt contact
the nylon insert of the flange locknut, and that each
shackle pivots freely.
Connecting the Drawbar to the Frame
Hitch
1.
Align the rod end of the drawbar to the frame hitch
(Figure 15).
G023743
1
2
3
4
4
5
Figure 15
1.
Bolt (3/4 x 4-1/2 inches)
4.
Short spacer
2.
Frame hitch
5.
Rod end
3.
Locknut (3/4 inch)
2.
Align a spacer on each side of the rod end, and insert
the bolt (3/4 x 4-1/2 inches) through the frame hitch,
the rod end, and the spacers.
3.
Secure the bolt with the locknut (3/4 inch) torqued to
163 to 217 N-m (120 to 160 ft-lb).
9