Figure 61
1.
Reserve tank-cap
2.
Reserve tank
5.
Disconnect the lower radiator hose and allow coolant
to flow into a drain pan.
6.
When coolant stops, connect the lower radiator hose.
7.
Remove the coolant-drain plug from the engine and
allow coolant to flow into a drain pan.
8.
When coolant stops, install the drain plug.
9.
Slowly fill the radiator with a 50/50 mixture of water
and permanent ethylene-glycol antifreeze
10.
Install the radiator cap.
11.
Fill the reservoir tank to the bottom of the filler neck.
12.
Start the engine and allow it to idle.
13.
As air escapes, fill the reservoir to the bottom of the
filler neck.
Note:
Do not allow the engine to heat up to the
running temperature.
14.
Install the reservoir-tank cap.
15.
Run the machine until it reaches the operating
temperature.
16.
Turn off the machine and allow it to cool.
17.
Check the coolant level again, and replenish it, if
required.
Brake Maintenance
Adjusting the Parking Brake
Service Interval:
After the first 10 hours
Every 200 hours
1.
Remove the rubber grip from the parking-brake lever
(
).
Figure 62
1.
Parking-brake lever
2.
Grip
2.
Loosen the set screw securing the knob to the parking
brake lever (
3.
Rotate the knob until a force of 20 to 22 kg (45 to 50
lb) is required to actuate the lever.
Figure 63
1.
Parking-brake lever
3.
Set screw
2.
Knob
4.
Tighten the set screw when finished.
Note:
If no adjustment is left at the handle, loosen the
handle to the middle of the adjustment and adjust the
cable at the rear, then repeat step
5.
Install the rubber grip onto the parking-brake lever.
48
Содержание 07385 Workman HDX-D
Страница 39: ...Figure 41 39 ...
Страница 56: ...Notes 56 ...
Страница 57: ...Notes 57 ...
Страница 58: ...Notes 58 ...