Maintenance
Preparing for Maintenance
Before starting on any maintenance procedure, do
the following:
1.
Park the machine on a level surface.
2.
Lower the spiker units fully to the ground so that
the suspension hydraulics are fully extended.
3.
Engage the parking brake, shut off the engine,
and remove the key.
Lubrication
Service interval:
Every 15 hours.
Lubricate the 2 grease fittings (
) on each
spiker unit after every 15 hours of operation using
a No. 2 lithium grease. For best results, use a
hand-operated grease gun.
g018318
Figure 7
1.
Prepare for maintenance; refer to
Maintenance (page 6)
2.
Wipe each grease fitting (
) with a clean
rag.
3.
Apply grease to the spiker shaft bearings until
you feel pressure.
4.
Wipe excess grease away.
Removing the Spiker Units
1.
Prepare for maintenance; refer to
Maintenance (page 6)
2.
Push the motor retaining bar out of the slots on
the motor toward the spiker unit and remove the
motor from the spiker unit.
g014605
Figure 8
1.
Motor
2.
Motor-retaining bar
3.
Move the motor to the storage location on the
front of the suspension arm.
Important:
Do not raise the suspension to
the transport position when the reel motors
are in the machine-frame holders. Damage
to the motors or hoses could result.
If you must move the traction unit without
the spiker units installed, use cable ties to
secure the motors to the suspension arms.
4.
Open the latches on the suspension-arm bar of
the spiker unit that you are removing.
5.
Disconnect the latches from the spiker unit bar.
6.
Roll the spiker unit out from under the
suspension arm.
7.
Repeat steps
through
for the other spiker
units as required.
6
Содержание 04723
Страница 8: ...Notes...
Страница 12: ......