2
Installing the Electrical
Counterweights
Parts needed for this procedure:
3
Counterweight (not included)
6
Bolts (not included)
24
Washer (not included)
Procedure
Note:
If you are installing the spiker on traction unit
Model 04540, or on an eTriFlex traction unit Model
04580 or 04590, add an additional counterweight
(Part No. 117-6774-03).
1.
Remove and discard the existing counterweight
bolts from the spiker side plate.
2.
Install 2 bolts (5/16-18 x 2-3/4 inch) as shown
in
Note:
The bolts (Part No. 322-33) are not
included with the spiker.
g254873
Figure 6
1.
Bolts (5/16-18 x 2-3/4
inch)
2.
Washers
3.
Install 4 washers (1/8 inch) per bolt between the
counterweight and the spiker side plate (
Note:
The washers (Part No. 63-8410) are not
included with the spiker.
4.
Install the auxiliary weight (Part No.
117-6774-03) with bolts.
Note:
You can use the auxiliary weight and
bolts provided with the traction unit, or order
additional weights (Part No. 117-6774-03) and
bolts (Part No. 322-33).
Operation
Training
Before spiking greens, find a clear area to practice
starting, stopping, raising, lowering, and rolling with
the spiker. This training helps you gain experience
and confidence with the spiker before using it on a
green.
Operating Tips
•
Survey the green to determine if there are any
obstacles that will be damaged or will damage
the spikers, such as sprinkler heads or other
protruding objects.
•
Maintain a straight line when spiking. Do not turn
the machine when the spikers are fully lowered
and contacting the ground.
•
When you reach the edge of the green, raise the
spikers before turning or stopping the machine.
You must raise the spikers completely before
making turns.
5
Содержание 04723
Страница 8: ...Notes...
Страница 12: ......