Figure 19. Coolant Pump mounted on top 
of tank. 

 

Locate, remove and discard the two screws on the side of 

the spindle head as shown in Figure 17. New bolts are 

supplied with the coolant tank assembly

. Note these 

screws may be painted heavy and hard to see!! 

 

 

 

 

 

 

Connect the Plastic Coolant Tube(6) to the Connecting 

Tube (4); Place the Connecting Tube (4) into the 

Support (5); Fasten the Nut on the Flexible Tube (1) to 

the Connecting Tube (4); Use the Cap Screws (8) to fix 

the Support (5) to the Mill Head (9). Finally tighten the 

Screw (7) to fix the Connecting Tube (4). The completed 

assembly is shown Figure 18.

 

 

 

 

The coolant pump is mounted on the top of the coolant tank as 

shown in 19. Use Teflon tape on the connection. Note that the 

coolant pump is dual voltage (110VAC/220VAC). The pump is 

shipped with the wiring configured for 110 VAC. If the pump is to be 

used with 220 VAC unscrew the electrical pump cover plate and 

re-wire the pump per the diagram on the inside of the lid. 

 

Figure 18. Coolant tube to mill connections.   

 

Figure 17. shows 2 plug screws on side of 
spindle, screws must be removed and 
discarded. 

 

Содержание PCNC 770

Страница 1: ...rmach PCNC 770 Stand Tormach PCNC Machine Arm Assembly manual 2011 Tormach LLC All rights reserved Questions or comments PCNC 770 Stand Manual Please email us at Part Number 32366 Rev 1 info tormach c...

Страница 2: ...com Contents 1 Getting Started 3 2 Receiving the Stand 4 3 Attach the feet to the stand 5 4 Lift the mill on to the stand 7 5 Bolt the PCNC on the stand 7 6 Installing oil pump 7 7 Attach the Coolant...

Страница 3: ...eople assemble the stand Gather all the appropriate tools Screw drivers slotted and phillips Tape measure Socket set and wrenches Metric taps and handle Level Allen wrenches Shears Hammer Pry bar Some...

Страница 4: ...er gloves and eye protection when cutting the bands on the crate Figure 1 The large crate contains the base and splash guards Remove the crate sides plastic covering and cloth straps Set aside the spl...

Страница 5: ...into the foot pad and place the spacer on the bolt as shown in Figure 5 The spacer brings the stand to the correct height and makes room to for a pallet jack under the stand To review foot steps are...

Страница 6: ...jack is useful for positioning the stand Level the stand and make sure it is resting solidly on all 4 adjustment feet We recommend keeping the stand at least 12 From the wall If you are very limited o...

Страница 7: ...dures when lifting the mill onto the stand 5 Bolt the PCNC on the stand Once the mill has been safely placed on the landing pads of the stand attach the mill to the stand with the 4 mounting studs 6 f...

Страница 8: ...fferent You may need to run a tap into the holes to clean the paint out of the threads It is very helpful to have another person help position the tray and to hold it in place Figure 13 Prior to attac...

Страница 9: ...ecommended for the splash guard bolts but not for the joint between the splash guards and the coolant tray 8 Coolant System Installation Coolant tank is placed behind PCNC 770 with the exit trough dir...

Страница 10: ...s 8 to fix the Support 5 to the Mill Head 9 Finally tighten the Screw 7 to fix the Connecting Tube 4 The completed assembly is shown Figure 18 The coolant pump is mounted on the top of the coolant tan...

Страница 11: ...rd Before you mount the splash guard to the mill you need to remove the protective screws from the table of the mill as shown in Figure 20 The table mounted splash guard comes with six pieces as shown...

Страница 12: ...machine arm configured for holding a tool tray The arm is mounted to the mill column using the 4 bolts washers and lock washers provided For mounting to the control panel insert a bolt and a small was...

Страница 13: ...Figure 27 Machine arms in suggested configuration...

Отзывы: