![Toptech MultiLoad II DIV-2 Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/toptech/multiload-ii-div-2/multiload-ii-div-2_installation-manual_1129916037.webp)
28
Figure 4.10
Ticket Printer / Data Logger Connections without Handshake
When Print or Alibi Log is configured to be on COM 2, the CTS handshake line MUST be
connected or a printer error will occur, preventing loading.
A Special variant of the ticket printing uses the
PTB protocol.
A PTB printer can be connected to the MultiLoad II/ RCU
II
via RS232 on COM 2 or COM1:
Figure 4.11
PTB Printer Connection with Handshake
MultiLoad II/
RCU II COM 2
Printer Logger RS232
DB25 Connector
RX
CTS
TX
GND
DSR
DCD
RTS
(N/C) DTR
2 - TX
20 - DTR
3 - RX
7
– GND
4
– RTS
5
– CTS
6
– DSR
8 - DCD
MultiLoad II/
RCU II COM 2
PTB Printer/ Logger
RS232 DB25 Connector
RX
CTS
TX
GND
DSR
(N/C) DCD
(N/C) RTS
(N/C) DTR
2
– TX
20 - DTR
3
– RX
7
– GND
4
– RTS
5
– CTS (N/C)
6
– DSR (N/C)
8
– DCD (N/C)
Содержание MultiLoad II DIV-2
Страница 1: ...MultiLoad II RCU II DIVISION 2 DIV2 Installation Guide Part 6074...
Страница 7: ...Hardware Revision 80 9 1 Manual Revision 81 9 2...
Страница 18: ...9 2 1 2 2 Back View Figure 2 3 Unit Outline Drawing Back View RCUII ML II Div 2 MOUNTING TEMPLATE...
Страница 20: ...11 2 1 2 4 Side View Figure 2 6 Unit Outline Drawing Side View...
Страница 25: ...16 Figure 3 1 Suggested Mounting Position Figure 3 2 Screen Visible Area...
Страница 59: ...50 Typical 1 Meter Application Wiring Example IP E Drawing Electrical Wiring Schedule 5 4 14...
Страница 64: ...55...
Страница 73: ...64...
Страница 88: ...79 Chapter8 HardwareRevisionHistory Compatibility Chapter 8...