5
FCM II Installation Guide: 20160419 - Part # 2307
Table of Contents
Electrical Considerations and Regulatory Requirements ................................................................................3
CHAPTER 1
General ...........................................................................................................................................8
1.1
Who Should Use This Guide ...................................................................................................................8
1.2
Information Alerts: ....................................................................................................................................8
1.3
Receiving and/or Returning Equipment: ................................................................................................8
1.4
Operating Characteristics: ......................................................................................................................8
1.4.1
Electrical Ratings: ...................................................................................................................................9
1.4.2
Operating Conditions: .......................................................................................................................... 10
1.5
Electrostatic Discharge (ESD) Protection: .......................................................................................... 10
CHAPTER 2
Installation .................................................................................................................................. 11
2.1
Module Installation ................................................................................................................................ 11
2.2
Module Removal .................................................................................................................................... 11
2.3
FCM II Panels And Enclosures: ............................................................................................................ 12
2.3.1
Panel Layouts: ..................................................................................................................................... 12
2.3.2
Panel Wiring......................................................................................................................................... 12
2.3.3
Enclosure Mounting ............................................................................................................................. 12
2.4
Electrical Supply Connections ............................................................................................................. 13
2.5
Serial Communication Connection ...................................................................................................... 14
2.6
Device Address Configuration ............................................................................................................. 15
2.7
Swing Arms ............................................................................................................................................ 16
CHAPTER 3
Field Wiring ................................................................................................................................ 18
3.1
Connection Requirements .................................................................................................................... 18
3.2
FCM II Field Device Connections ......................................................................................................... 18
3.2.1
Terminal Identification .......................................................................................................................... 19
3.2.2
Flow Meter and Control Valve Wiring .................................................................................................. 20
3.2.3
Additive Wiring ..................................................................................................................................... 21
3.2.4
RTD Temperature Probe Wiring .......................................................................................................... 22
3.2.5
4-20mA Input Wiring: LOOP CURRENT PROVIDED BY EXTERNAL POWER SUPPLY ................. 23
3.2.6
4-20mA Input Wiring: LOOP CURRENT PROVIDED BY TRANSMITTER ......................................... 24
3.2.7
4-20mAOutput Wiring .......................................................................................................................... 25
3.2.8
AC Permissive/Status Wiring (6ACIN) ................................................................................................. 26
3.2.9
AC Output Wiring (6ACOUT) .............................................................................................................. 27
3.2.10
DC Permissive/Status Wiring (6DCIN) ............................................................................................ 28
3.2.11
DC Permissive/Status Wiring (4DCIN/4ACOUT) ............................................................................. 29
3.2.12
AC Output Wiring (4DCIN/4ACOUT) ............................................................................................... 30
3.2.13
DC Output Wiring (6DCOUT) .......................................................................................................... 31
3.2.14
3 Output Air Eliminator Wiring ......................................................................................................... 32
3.2.15
2 Output Air Eliminator Wiring ......................................................................................................... 33
3.2.16
Lectro Count Remote Display Wiring .............................................................................................. 34
CHAPTER 4
Simulation................................................................................................................................... 35
4.1
Meter Simulation .................................................................................................................................... 35
4.2
Additive Simulation ............................................................................................................................... 35
4.3
Analog Simulation ................................................................................................................................. 35
4.4
Generic I/O Simulation .......................................................................................................................... 35
CHAPTER 5
Troubleshooting ........................................................................................................................ 36
5.1
Is The Module Powered?....................................................................................................................... 36
5.2
Is The Module Communicating? .......................................................................................................... 36
5.3
Are The Inputs Functioning? ................................................................................................................ 37
5.4
Are The Outputs Functioning? ............................................................................................................. 37