9
6
. Sign the bolt-hole point on the gate post and gate. Do this by placing a
punch or a sign in the middle of each bolt slot on the post bracket and the
gate bracket. It allows slight adjustments to the post bracket. Then remove
the opener and brackets assy. by taking off the C-clamps.
7.
Drill 10.5 mm diameter holes through the post and the gate at the
marked locations.
8.
Attach the post bracket assemblies to the gate posts by inserting M10 x
200 bolts through each post bracket assembly and the drilled holes in the
gate post. Fasten each bolt with one
¢
10 washer, one
¢
10 lock washer,
and one
¢
10 nut.
9.
Attach the gate brackets to each gate by inserting two M10 x 75 bolts
through the gate brackets and the drilled holes in the gates. Fasten each
bolt with one
¢
10 lock washer, and one
¢
10 nut.
10.
Cut off any part of the bolts that extend beyond the tightened nuts.
11.
With the gate opener fully retracted and with the gate in the fully open position (for Pull-to-Open installation),
attach the gate opener to the Post Bracket Assembly and the Gate Bracket by inserting a clevis pin through the
gate opener and the Post Pivot Bracket and another clevis pin through the gate opener and the Gate Bracket.
Secure each clevis pin with a hairpin clip.
Содержание KD902
Страница 6: ...3 KD902 Parts List Accessories Parts Included in some models refers to the actual package...
Страница 18: ...15 Connecting of the Control Board...
Страница 28: ...25 Quick Setting Guide...
Страница 29: ...26...
Страница 30: ...27...
Страница 31: ...28...