background image

 

 

 

Installation of the Magnets 

Before install limit switch, make sure the gate opener is put in manual operation. (the clutch connected with 
gear shaft is disengaged) and the mains power supply is disconnected. 
Position the S&N Magnet Components approximately on the gate and move the gate by hand to fix them in 
place. 

Fit magnets bracket 

Push the gate fully closed by hand. Locate and install the magnet bracket so that the opener will stop at the 
desired close position when the close limit switch approaches it.   
Push the gate fully open by hand. Locate and install the magnet bracket so that the opener will stop at the 
desired open position when the open limit switch approaches it.   

The magnet component with N pole outside must be installed at left side and the magnet component 
with S pole outside must be installed at right side from the view inside of property.

 

Ensure magnet center to align with the marked line above ! 

The magnets should be 

25~30mm (1-1.2”)

 away from the 

Limit Switch Box

. If it is too near or too far, the 

switches will fail to work. Adjust the position of the magnets until the positions of the opening and closing 
meet the requirement. 
 
 
 
 

 

Important:   

* Check that the rack teeth must engage the gear teeth throughout their full thickness. If not, adjust the 
position of the opener or/and place a few shims between the rack and gate. 
* Manually slide the gate leaf to ensure the rack is proper on the gear of opener. 
* Repeat same steps of first rack section to install the rest rack sections until proper length is reached. 
* Cut away any excess of the rack (Note: rack length must be longer than actual travel of the gate) 
 
 

Connection of the Power Supply 

WARNING: NEVER connect the gate opener to the power outlet before all the installations have 

Warning:  

Improper magnets installation may cause the gate crash into end barrier, 

which is very dangerous !

 

Содержание DKR500

Страница 1: ...om VER 21b C030566 DKR500 S Y T Please read and follow all warnings precautions and instructions before installation and use Never connect the solar panel to the control board directly to charge the b...

Страница 2: ...azon co uk Amazon de Other Please Specify Order Product Model Purchase Date Full Name Phone Email Address VERY IMPORTANT Street Address Apartment Unit City State Province Zip Code Country Region Appro...

Страница 3: ...rts 5 Technical Specifications Features 5 Installation Overview 6 Installation of the Opener 6 Manual Operation 7 Fit the Plastic Rack Reinforced with Steel 7 Installation of the Magnets 8 Connection...

Страница 4: ...ntation could damage the product and be dangerous The factory declines all responsibility for any consequences resulting from improper use of the product or use which is different from that expected a...

Страница 5: ...gate opener check that all moving part as well as the sliding gate is in good mechanical condition correctly balanced and opens and closes properly Save these instructions for future use Preparation f...

Страница 6: ...3 In sake of safety a positive stop must be mounted on the two end of ground track...

Страница 7: ...ded in some models refers to the actual package Optional Accessories Parts List Available at TOPENS Store M12 Remote Control ERM12 External Receiver TC186 R WiFi Smartphone Remote Control with Camera...

Страница 8: ...Heavy Duty Gear Rack RNH4 Heavy Duty Gear Rack Replacement Parts DKPYMJ1B Control Board PYMJ CKG Limit Switch Technical Specifications Features Specifications Model DKR500 S Y T Power input 110 120V 6...

Страница 9: ...install and minimum maintenance requirement Installation Overview Installation of the Opener Caution Be sure that the opener is installed in a level and paralleled position and is properly secured Imp...

Страница 10: ...the rack Manual Operation You can open the gate by manual when power failure And the opener should be put in the manual emergency release position before fitting the rack installing the opener and lim...

Страница 11: ...side from the view inside of property Ensure magnet center to align with the marked line above The magnets should be 25 30mm 1 1 2 away from the Limit Switch Box If it is too near or too far the swit...

Страница 12: ...is situation you can connect the AC electricity following the Power Mode 1 and the batteries to the BAT terminal of the control board directly as the below wiring diagram Power Mode 3 Only use the bat...

Страница 13: ...ong time maybe 4 5 days one time then you can charge the batteries with the AC electricity and the solar panel at the same time The capacity of the batteries should be at least 7Ah and the power of th...

Страница 14: ...uld be connected into the 1 terminal The RED wire of the motor should be connected into the 2 terminal 2 Limit Switches The YELLOW wire of the limit switches should be connected into the 3 terminal Th...

Страница 15: ...N wire of the exit wand should be connected into the 19 terminal The sensitivity adjustment board should be wired to the GREEN wire and the YELLOW wire of the wand No matter the polarity 7 Battery ONL...

Страница 16: ...NOTE The midway mode function would be disabled if both DIP switches are turned off Factory default setting is disabled The midway mode could be activated by pressing button B of the remote control w...

Страница 17: ...imum Test the Reversing Sensitivity For the sake of safety it is very important to test the reversing sensitivity as soon as the control board set is finished The reversing sensitivity adjustment is i...

Страница 18: ...Universal External Receiver is also compatible with other brand swing gate opener sliding gate opener and garage door opener How to Use the Remote to Operate Your Gate Opener Each remote has four butt...

Страница 19: ...pener does not run Power LED is OFF 1 Make sure that the power cord is properly plugged into the mains outlet 2 Check if the output voltage of the transformer is 24VAC If the voltage measures 0 the tr...

Страница 20: ...k the control board Replace the control board if necessary The gate starts but it is immediately stop or reverse 1 Check the HALL sensor board in the side of the gear box has been connected to the con...

Страница 21: ...earthed and correctly terminated Always check the Stop Reverse in case of obstruction function when performing any maintenance If this function can t be made operable remove this opener from service u...

Страница 22: ...e any need to contact us the info below will help you get in touch TOPENS Website www topens com Contact Us E mail support topens com Kindly include your Product Model Purchasing Date Site Order and y...

Отзывы: