background image

 

2). Make sure there is 1” distance at least between the wheel cover and the gate after you position the base 

plate. 

     

 

 

Caution:   

*Be sure that the opener is installed in a level 

and paralleled position.  Improper installation 

could result in property damage, severe injury, 

and/or death. 

* Before starting installation, ensure that there 

is no point of friction during the entire 

movement of the gate and there is no danger 

of derailment. 

* Ensure that the safety side rollers are 

present. 

Necessary Tools: 

The following tools may be 

necessary to install the Gate opener. You will 

need screwdrivers, an electric drill, wire cutters 

and a wire stripper, a socket set, and possibly 

access to a welder.

 

When install the opener, you should build a 

concrete pad to support the base plate of opener 

in order to maintain proper stability. 

The installation proceeds are as follows: 

1.

Assemble the Base Plate and fix the Opener to 

the Base Plate.

 

2.

Dig a hole for a concrete pad which should be 

approximately 60 x 32 x 35cm (24

x 13

x 14

). 

It may protrude 10 cm (4”) above ground and 25 

cm (10”) in depth underground. Increase the pad 

height if necessary to protect the system from flooding, heavy snow etc. 

3.

  Prepare one or more conduits for the electrical cables before pour concrete. Remember that cable 

conduits have to pass through the hole on the base. 

4. 

Pour concrete and before it starts to harden, check that it is parallel to the gate leaf and perfectly level. 

5.

 Mark the position of four expansion anchors according to the position of mounting hole on the base plate. 

Double check your marking, move the base plate and drill the 4 holes using a 14mm (9/16”) masonry bit. Put 

the 4 expansion anchors (provided) into the holes and firmly tighten. 

6. Mount the base plate to the concrete Pad and firmly tighten, enabling the opener is firmly secured 

on the concrete pad during the whole gate travel.

 

Содержание CK700

Страница 1: ...r s Manual Model TOPENS Website http www topenstool com CK700 Please read and follow all warnings precautions and instructions before installation and use Periodic checks of the opener are required to...

Страница 2: ...Specifications Features 4 Installation Overview 5 Installation of the Opener 5 Manual Operation 7 Installation of chain and chain brackets 7 Installation of the Magnets 8 Connecting of Power Supply 8...

Страница 3: ...ere The factory declines all responsibility for any consequences resulting from failure to observe Good Technical Practice when constructing closing structures door gates etc as well as from any defor...

Страница 4: ...the current standards especially as follows The gate sliding track is linear and horizontal and the wheels are suitable the gate should be mounted and moving freely Check that the structure is suffic...

Страница 5: ...3 Parts List...

Страница 6: ...ailable at TOPENS Store Technical Specifications Features Specifications CK700 Power input 110V 120V 60Hz or 220 240V 50Hz Motor voltage 120VAC or 230VAC Rated power 300W Gate moving speed 15 cm s 6 i...

Страница 7: ...sing Built in adjustable auto close 1 99 seconds Built in max Motor Running Time MRT for multiple safety protection 90 seconds Reliable electromagnetism limit for easy adjustment Can be equipped with...

Страница 8: ...proceeds are as follows 1 Assemble the Base Plate and fix the Opener to the Base Plate 2 Dig a hole for a concrete pad which should be approximately 60 x 32 x 35cm 24 x 13 x 14 It may protrude 10 cm 4...

Страница 9: ...are not fit for the gate frame use the appropriate bolts to attach the chain brackets to gate frame 2 How to install the chain 1 Place the chain around the top of the idler wheels and under the drive...

Страница 10: ...ent with N pole must be installed at left side and the magnet component with S pole must be installed at right side from the view inside of property Ensure magnet center to align with the marked line...

Страница 11: ...inal 2 Limit Switches The YELLOW wire of the limit switches should be connected into the 8 terminal The BLACK wire of the limit switches should be connected into the 9 terminal The RED wire of the lim...

Страница 12: ...The gate operator works alternately by pushing the button open stop close stop open 8 External receiver optional The RED wire of the external receiver should be connected into the 11 terminal The BLA...

Страница 13: ...ometers Potentiometer A and B are used to adjust the stall force and auto close time of the gate operator separately Turn potentiometer A clockwise to increase the stall force and turn it counter cloc...

Страница 14: ...d set or restart after power off How to Program or Erase the Remote The remote MUST be programed to the opener BEFORE OPERATING Please follow the steps to program the remote Activate the opener only w...

Страница 15: ...may program either C button or D button with TOPENS swing gate opener Wireless Keypad Programming You can follow the below steps to program wireless keypad to the opener Press the LNSW button until t...

Страница 16: ...te is too far away from the opener Try it again closer 3 Remote control is not suitable for receiver After making sure the codes are correct erase remote controls and then re program the codes in the...

Страница 17: ...operable remove this operator from service until the cause of the malfunction is identified and corrected then use a jumper wire to short the 3 terminals together to try it again Replace the limit swi...

Страница 18: ...do not hesitate to contact us E mail support topenstool com Kindly include your Product Model Purchasing Date Site Order and your contact information All your concerns will be replied within 24 hours...

Отзывы: