background image

 

 

16 

 

 

 

 

 

 
 
 
 
 
 
 
 
 

 

 

 

Motor connection for PULL-TO-OPEN 

Actuator 1 (for PULL-TO-OPEN) 

Insert the stripped cable wires into the appropriate terminals on the opener  terminals block. The 

red

    wire 

should be inserted into the “

” 

terminal, the 

black

 wire into “

MOTOR1-“

, the 

blue

 wire into 

ULT1

, the 

green

 wire into 

COM

, and the 

yellow

 wire into 

DLT1

 terminal. 

Actuator 2 (for PULL-TO-OPEN) 

Similar as the connection of 

Actuator 1

, insert the stripped cable wires into the appropriate terminals on the 

opener  terminals block. The 

red

  wire should be inserted into the 

 

terminal, the 

black

  wire into 

MOTOR2-

, the 

blue

 wire into 

ULT2

, the 

green

 wire into 

COM

, and the 

yellow

 wire into 

DLT2

 terminal. 

NOTE:

 It is recommended that Gate Opener 1 is installed in the Master Gate, and Gate Opener 2 is installed in 

the Slave Gate. 
 

Warning Light (Included in some models, refers to the actual package) 

The red wire of the warning light should be inserted into 

+LAMP (#11) 

terminal, the white wire into the 

LAMP-

 

(#12)

.

 

Back-up Battery & Solar Panel & Solar Controller (optional) 

If there is 

no solar panel

 to be used for charging the battery, then the

 “24V+”

 of the battery should be wired to 

the 

BAT+ (#13)

 terminal. 

“24V-”

 should be wired to 

“BAT-” (#14) 

terminal. 

The battery could also be charged by the solar panel & solar controller. Please refer to the manual instruction of 
solar panel and controller separated for wire connection. 

Photocell Beam System (PBS)   

(Included in some models, refers to the actual package) 

Use a 2-core cable to connect the 

“- ~”

 terminal of the photocell’s emitter to the “14” terminal, the 

“+ ~”

 terminal 

to the “9” terminal. Also the 

“- ~”

 and 

“+ ~”

 terminals of the photocell’s receiver should be connected to the “14 

and “9” terminals in parallel. 
Use another 2-core cable to connect the 

“COM”

 terminal of the receiver to the “17” terminal, the 

“NC”

 terminal 

Motor connection for PUSH-TO-OPEN 

The motors’ power wires  and limit wires  connection by 

“Push to Open”

 is different from the connection by 

“Pull 

to Open”

. So motor 1 and motor 2 wires should be 

connected to the control box as the instruction on the right. 
The 

black

 wire should be inserted into the Motor+ terminal, 

the 

red

 wire should be inserted into the Motor- terminal, the 

yellow

  wire into ULT1 terminal,  the 

blue

  wire into DLT1 

terminal and the 

green

 wire is still into COM terminal.

 

Содержание Casar MT8012

Страница 1: ...ens com MT8012 VER 21a C030564 Please read and follow all warnings precautions and instructions before installation and use Never connect the solar panel to the control board directly to charge the ba...

Страница 2: ...k Amazon de Other Please Specify Order Product Model Purchase Date Full Name Phone Email Address VERY IMPORTANT Street Address Apartment Unit City State Province Zip Code Country Region Approximate Ga...

Страница 3: ...ion 7 Install the Opener on the Gate for Pull to Open 7 Install the Opener on the Gate for Push to Open 10 Mounting the Control Box 13 Connection of the Power Supply 14 Connecting of the Control Board...

Страница 4: ...ould never cross the pathway of a moving gate The gate opener is not acceptable for use on any pedestrian gate Pedestrians must be supplied with a separate pedestrian access 9 For an installation util...

Страница 5: ...eway gates made by steel wood vinyl and shaped as panel tube and chain link While use on solid surface gates is NOT recommended Solid surface gates have a high resistance to the wind If the wind is st...

Страница 6: ...3 MT8012 Parts List Accessories Parts Included in some models refers to the actual package JD24VY 24V Warning Light TC102 Photo Eye Beam Sensor 25FT Extension 5 Conductor Cable...

Страница 7: ...it Wand HLR01 HomeLink Remote Control Kit TC173 Wireless Push Button TC147 Wired Push Button ET24 Electric Gate Lock TRF3 Reflection Photocell Sensor TC102 Photo Eye Beam Sensor JD24VY 24V Warning Lig...

Страница 8: ...Travel 380mm 15 in Ambient Temperature 20 50 4 F to 122 F Protection Class IP44 NOTE NR indicates this size and weight combination is NOT recommended for one arm actuator NOTE Ball bearing hinges shou...

Страница 9: ...g Reverse in case of obstruction during gate closing Built in adjustable auto close 0 99 seconds Built in max Motor running time MRT adjustable for multiple safety protection 1 50 seconds Digital disp...

Страница 10: ...bles are required to determine the proper mounting position for the Post Bracket The tables show the maximum opening angle of the gate for a given A and B For example if A is 18cm and B is 16cm the ma...

Страница 11: ...with the Post Bracket Assy and Gate Bracket on the gate post and the gate While holding the gate opener in the level position temporarily secure it with two C clamps 5 Make sure that there is a minimu...

Страница 12: ...ions 8 Attach the post bracket assemblies to the gate posts by using four expansion bolts 9 Attach the gate brackets to each gate by inserting two M8x80 bolts through the gate brackets and the drilled...

Страница 13: ...ortant The following illustrations and tables are required to determine the proper mounting position for the Post Bracket The tables show the maximum opening angle of the gate for a given A and B For...

Страница 14: ...for Push to Open installation place the opener with the Post Bracket Assy and Gate Bracket on the gate post and the gate While holding the gate opener in the level position temporarily secure it with...

Страница 15: ...semblies and the gate bracket It allows slight adjustments to the post bracket Then remove the post bracket and gate bracket by taking off the C clamps 7 Drill 14mm diameter holes on the gate post and...

Страница 16: ...is restores normal operation NOTE The setting of the PULL PUSH TO OPEN of the control board should be in accordance with the installation Mounting the Control Box Step 1 To install the control box use...

Страница 17: ...t other cables into the control box through rightmost strain relief Then repeat step 2 NOTE Only motor cables 1 5m length are provided Other cables are subject to site installation requirement and not...

Страница 18: ...15 Connecting of the Control Board...

Страница 19: ...e is no solar panel to be used for charging the battery then the 24V of the battery should be wired to the BAT 13 terminal 24V should be wired to BAT 14 terminal The battery could also be charged by t...

Страница 20: ...OWN wire of the external receiver should be connected into the 19 terminal The BLACK wire of the external receiver should be connected into the 20 terminal The RED wire of the external receiver should...

Страница 21: ...e to only operate TOPENS swing gate opener A B C and D four buttons share same function once they are programmed with TOPENS swing gate opener You may choose any button to program it with our swing ga...

Страница 22: ...ensure successful programming Setting of the Control Board WARNING Ensure the gate opener is Power Off when you make any adjustment of the gate opener Keep away from the path of the gate during you se...

Страница 23: ...tween Master Slave Gate Setting The open interval can be adjusted by pressing the INC and DEC Buttons respectively The Digital Display will show 0 9 which indicates the interval time 0 means the Maste...

Страница 24: ...MOTOR1 is adjusted by pressing INC and DEC buttons respectively The Digital Display will show 01 50 which indicates the MRT of MOTOR1 from 1 to 50 seconds You can hold pressing the INC or DEC button...

Страница 25: ...eriod STP is set at 3 sec and the GRP is 23 sec you can calculate the GRP period by yourself from the arm actuator starting to move on the fully open position to the arm arriving at the fully close po...

Страница 26: ...y a silicone spray to reduce its friction In cold climates where temperatures reach 1 C 30 F or less spray silicone on the actuator every 4 6 weeks to prevent freeze up 2 Regularly check gate hinges t...

Страница 27: ...n cold weather as the gate will not move freely 3 Check if the MRT period is too short Gate opens but does not close 1 Photocell PBS function is enabled in control board setting but is not equipped op...

Страница 28: ...25 Quick Setting Guide...

Страница 29: ...26...

Страница 30: ...27...

Страница 31: ...28...

Страница 32: ...any need to contact us the info below will help you get in touch TOPENS Website www topens com Contact Us E mail support topens com Kindly include your Product Model Purchasing Date Site Order and yo...

Отзывы: