background image

Items:

F-FL/70/50K/KN/BZ-67

F-FL/70/50K/SF/BZ-67

F-FL/70/50K/TR/BZ-67

www.topaz-usa.com

925 Waverly Ave  •  Holtsville, NY 11742  •  800-666-2852  •  Fax: 631-758-8026

INSTALLATION INSTRUCTIONS FOR LED MEDIUM FLOOD LIGHTS

F-FL/90/50K/KN/BZ-67

F-FL/90/50K/SF/BZ-67

F-FL/90/50K/TR/BZ-67

This product should be installed, inspected, and maintained by a qualified electrician only, in 
accordance with the NEC (National Electric Code) and all local codes.
Turn off electrical power before inspection, installation or removal.
Use only UL (or other NTRL) approved wire for input/output connections.
Minimum size 18 AWG or 14 AWG for continuous runs.
Make sure LEDs and drivers are cool to touch when performing maintenance.
Ensure supply voltage is equal to the rated voltage of the luminaire. 
Do not install in a hazardous atmosphere, only where the ambient temperature does not exceed the 
rated operating temperature of the fixture.

WARNING

RISK OF FIRE OR ELECTRIC SHOCK

Electrical Requirements

Prepare Electrical Wiring

Grounding Instructions

Read and follow all safety instructions before beginning installation

The LED driver must be supplied with 120V or 277V, 50/60 Hz
and connected to an individual, properly grounded branch circuit 
protected by a 20 ampere circuit breaker. Use min. 75°C supply.

The grounding and bonding of the overall system shall be 
done in accordance with NEC Article 600 and local codes

Tools Required: 

Crescent Wrench, Wire Strippers, Wire Cutters

Отзывы: