Overall structural inspection :

check all components and trusses to ensure the entire structure

is rectangular as specified in (picture 1). All trusses must be 90 degrees straight up from the

container.

Secure and tighten all bolts and nuts on this step. But do not over tie! Otherwise you might

damage the tubes or components.

Step 6 : Install the cover

Pass the tie down straps (#9) through the top cover and tie it to the top cover tension tube and

pass the other end through the ratchet, adjust the ratchet to tighten. Pull the front cover and back

cover and tie them to the truss. All four sides must be firmly tied together at the same time to

ensure that it is square, smooth and straight. All grommets need to be fixed to the frame with

wavy lines. Finally, install the waterproof plugs to both ends of the top cover tension tube (see

picture 6 and picture 7 below).

Содержание TMG-ST2040C-1.0

Страница 1: ...W W W T M G I N D U S T R I A L C O M P 0 9 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9...

Страница 2: ...ion Check all components and parts before installation All parts are marked with a part number please refer to the parts list to make sure you have all parts Choose a day with low or no wind to instal...

Страница 3: ...put the containers on hard foundations before installing the shelter Be aware of the surrounding area Do not set up the building near snowdrifts open flames or exposed electrical wires Do not keep he...

Страница 4: ...1 Step 2 Place the containers making sure they are parallel and the correct width apart Make sure there is a gap of about 3 feet around the building the center point of the round pipe of the base is t...

Страница 5: ...1 2 8 1 9 Picture 1 Step 3 Connect all trusses Layout all truss components on the ground in the correct configuration before bolting them together Components are 1x9 Peak arch tube 1 2x9 Middle rafter...

Страница 6: ...nd truss joints refer picture 2 as below Picture 2 Step 4 Put up all trusses Install each truss on the base tube Use hex bolt 10 to secure the truss to the truss baseplate We recommend to use a crane...

Страница 7: ...Picture 3 Install purlin tubes 4 and use locking bolts 11 refer picture 4 as below Components are 40 Purlin tube 4 45 Locking bolt 11 Picture 4 Step 5 Install the Ratchets Install the ratchets on the...

Страница 8: ...ou might damage the tubes or components Step 6 Install the cover Pass the tie down straps 9 through the top cover and tie it to the top cover tension tube and pass the other end through the ratchet ad...

Страница 9: ...U S T R I A L C O M P 8 9 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Components are 12 Top cover tension tube A 6 2 Top cover tension tube B 7 18 Tie down straps 9 1 Top cover 12 4 Water plug 13 1 Braided...

Страница 10: ...sary and clean the cover regularly Snow accumulating on the fabric cover must be removed as soon as possible Ifsnow is allowed to become solid ice on the cover it could increase theweight on the roof...