Main Specifications :

Overall assembled size : W6 x L12 x H2 (m) / 20 x 40 x 6.5 (ft)

Width : 6 m / 20ft

Length : 12 m / 40 ft

Ridge Peak Height : 2 m / 6.5 ft

Shoulder wall clearance height : 0.5 m / 1.6 ft

Prior to assembly

Please read the instructions carefully before installation. It is very important to follow your

local safety regulations and industry standards during installation. Regulations may include

but are not limited to:

-

Safety helmets, protective eyewear, and clothing

-

Safety harnesses for all elevatedworkers

-

Proper ladder, cage, and safety operation

Check all components and parts before installation. All parts are marked with a part

number, please refer to the parts list to make sure you have all parts.

Choose a day with low or no wind to install, assembly is hard in heavy wind. Do not make

any alterations to the structure. Do not hang any weights on the frame during installation,

including parts. We are not responsible for any damages or injuries caused by

inappropriate installation, unauthorized modifications or extreme weather.

This building is not intended for human occupancy.

It is recommended to tape or add foam/rubber on the frame where joints connect and

where it touches the cover. This will help extend the life span of the cover.

Read the following item list carefully and count the number of items to ensure that all parts

are included prior to setup.

Содержание TMG-ST2040C-1.0

Страница 1: ...W W W T M G I N D U S T R I A L C O M P 0 9 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9...

Страница 2: ...ion Check all components and parts before installation All parts are marked with a part number please refer to the parts list to make sure you have all parts Choose a day with low or no wind to instal...

Страница 3: ...put the containers on hard foundations before installing the shelter Be aware of the surrounding area Do not set up the building near snowdrifts open flames or exposed electrical wires Do not keep he...

Страница 4: ...1 Step 2 Place the containers making sure they are parallel and the correct width apart Make sure there is a gap of about 3 feet around the building the center point of the round pipe of the base is t...

Страница 5: ...1 2 8 1 9 Picture 1 Step 3 Connect all trusses Layout all truss components on the ground in the correct configuration before bolting them together Components are 1x9 Peak arch tube 1 2x9 Middle rafter...

Страница 6: ...nd truss joints refer picture 2 as below Picture 2 Step 4 Put up all trusses Install each truss on the base tube Use hex bolt 10 to secure the truss to the truss baseplate We recommend to use a crane...

Страница 7: ...Picture 3 Install purlin tubes 4 and use locking bolts 11 refer picture 4 as below Components are 40 Purlin tube 4 45 Locking bolt 11 Picture 4 Step 5 Install the Ratchets Install the ratchets on the...

Страница 8: ...ou might damage the tubes or components Step 6 Install the cover Pass the tie down straps 9 through the top cover and tie it to the top cover tension tube and pass the other end through the ratchet ad...

Страница 9: ...U S T R I A L C O M P 8 9 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Components are 12 Top cover tension tube A 6 2 Top cover tension tube B 7 18 Tie down straps 9 1 Top cover 12 4 Water plug 13 1 Braided...

Страница 10: ...sary and clean the cover regularly Snow accumulating on the fabric cover must be removed as soon as possible Ifsnow is allowed to become solid ice on the cover it could increase theweight on the roof...

Отзывы: