172-65530MAJ-04 (P46/65 Series + BD2) 6 Oct 2021
1
Contents
Introduction ....................................................................... 1
Safety Considerations ....................................................... 2
Checking the Piping .......................................................... 4
Operation .......................................................................... 5
Specifications .................................................................... 6
Configuration ..................................................................... 6
Installation ......................................................................... 7
Maintenance ...................................................................... 8
Disassembly/Reassembly ................................................. 9
Instructions for Plug/Holder Disassembly and Reassembly ... 11
Troubleshooting .............................................................. 12
TLV EXPRESS LIMITED WARRANTY ........................... 13
Service ............................................................................ 15
Options ............................................................................ 16
Introduction
Thank you for purchasing the TLV PowerDyne thermodynamic steam trap.
This product has been thoroughly inspected before being shipped from the
factory. When the product is delivered, before doing anything else, check the
specifications and external appearance to make sure nothing is out of the
ordinary. Also be sure to read this manual carefully before use and follow the
instructions to be sure of using the product properly.
The PowerDyne thermodynamic steam trap features a bimetal ring for
thermostatic air venting, which allows the quick, automatic discharge of large
quantities of initial air and cold condensate immediately after operation start-
up, thereby greatly reducing start-up time. It also reacts with great sensitivity
to the inflow of large quantities of condensate and hot air during operation,
preventing air binding.
The PowerDyne Thermodynamic steam trap, with its superior features listed
above, in combination with the proven performance record of the bimetal
thermostatic air vent, increases heating efficiency and reduces manpower
requirements for maintenance and bypass blowdown.
If detailed instructions for special order specifications or options not contained
in this manual are required, please contact TLV for full details.
This instruction manual is intended for use with the model(s) listed on the front
cover. It is necessary not only for installation but for subsequent maintenance,
disassembly/reassembly and troubleshooting. Please keep it in a safe place
for future reference.