7
STEP 3
Slide the Upright Sleeve (24) onto the Upright Post (4). Be careful not to pinch the wire
(
Middle Connection Wire (138)
STEP 4
Insert 2
Nylon Lock Nuts (M10) (134)
into the front of the
Main Frame (1)
(as
shown)
Install the
Upright Post (4)
to the
Main Frame (1)
using
2
Hex
Bolts (M10 x p1.5
x 50mm) (127).
Secure it with the
T-HANDLE SOCKET WRENCH (17MM)
.
STEP 5
Connect the
Middle Connection Wire (138)
to the
Lower Connection Wire (139)
Attach the
Front Decorative Cover (23)
onto the front of the
Main Frame (1
),
secure it with 2
Screw, Round Head (M5xp0.8x50mm)(109)
Paste a Logo Sticker on the surface of the
Front Decorative Cover (23).
Lower the
Sleeve (24)
to cover the gap on the
Main Frame Housing.
Содержание 9GE
Страница 1: ...ASSEMBLY MANUAL 9GE ELLIPTICAL TRAINER...
Страница 2: ......
Страница 4: ...3...
Страница 24: ......
Страница 25: ...24 EXPLODED DRAWING...
Страница 26: ...25...
Страница 27: ...26...