background image

 

6

 

 

ASSEMBLE INSTRUCTIONS     

   

Place all parts from the box in a cleared area and position them on the floor in front of 

you. Remove all packing materials from your area and place them back into the box. Do 

not  dispose  of  the  packing  materials  until  assembly  is  completed.  Read  each  step 

carefully before beginning. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

STEP 1 

 

Attach the Floor 

Leveler (76)

 to the 

Front Stabilizer (2)

and the 

Rear Stabilizer (3)

 

 

STEP 2   

Attach  the

  Front  Stabilizer  (2) 

and  the

  Rear  Stabilizer  (3) 

to  the

  Main  Frame 

Assembly  (1)

,  secure  it  using  4

  Washers  (8x38x2.0t)(97),  4  Lock  Washers 

(M8)(90) 

and  4

  Hex  Bolts  (M8xp1.25x65mm)(125)

.  Tighten  it  securely  with  the 

socket wrench (as shown). 

 

Adjust the Floor Leveler if the Bike is NOT leveled to the floor. 

Make sure the Metal 

Plates are fully tightened.

 

 
 
 

 

Detailed Lever- drawing 1 

 

Detailed Lever- drawing 2 

Metal Plate 

Stabilizer 

Floor Leveler 

(27) 

 

 

Stabilizer 

Adjustment Plate 

Floor Leveler 

(27) 

Содержание 9GE

Страница 1: ...ASSEMBLY MANUAL 9GE ELLIPTICAL TRAINER...

Страница 2: ......

Страница 3: ...develop during these rest periods Beginners should work out twice a week and increase gradually to 4 to 5 times per week Remove all jewelry including rings chains and pins before commencing exercise...

Страница 4: ...3...

Страница 5: ...TOOLS ARE INCLUDED FOR ASSEMBLY Left Upper Handlebar Pulse Sensor Plate Stationary Handlebar Right Upper Handlebar Console Upright Post Front Stabilizer Accessory Tray Left Pedal Right Pedal Pedal Ra...

Страница 6: ...w DOES NOT the head to the bolt or screw After unpacking the unit open the hardware bag and make sure that you have all the following items Some hardware may be already attached to the part No Descrip...

Страница 7: ...6 to the Front Stabilizer 2 and the Rear Stabilizer 3 STEP 2 Attach the Front Stabilizer 2 and the Rear Stabilizer 3 to the Main Frame Assembly 1 secure it using 4 Washers 8x38x2 0t 97 4 Lock Washers...

Страница 8: ...he Main Frame 1 using 2 Hex Bolts M10 x p1 5 x 50mm 127 Secure it with the T HANDLE SOCKET WRENCH 17MM STEP 5 Connect the Middle Connection Wire 138 to the Lower Connection Wire 139 Attach the Front D...

Страница 9: ...p1 5x8t 134 from the Left Pivoting Arm 8L b Attach the Left Pedal Support Arm 12L onto the Left Pivoting Arm 8 and secure it with the Bolt Hex Head M10xp1 5x55mm 126 and Nylon Lock Nut M10xp1 5x8t 134...

Страница 10: ...uff 50mm 148 Secure it using 1 Lock Washer M8 90 and 1 Washer 8x23x2 0t 95 on 1 Bolt Button Head M8xp1 25x16mm 120 Tighten it securely with the Allen Wrench DO NOT over tighten it as this is a pivot p...

Страница 11: ...Loosen and remove the Bolt Hex Head M8xp1 25x15mm 124 and Lock Washer M8 90 from the Pedal Slider 63R Attach the bottom of the Right Linkage 11 onto the Right Pedal Slider 63R and secure with Bolt Hex...

Страница 12: ...Repeat the same procedure to install the Left Pivot Cuff 35 and Right Pivot Cuff 36 to the Left Pivoting Arm 8 STEP 11 a Install the Left Pedal Assembly 42 43 44 to the Left Pedal Slider 63L using 4 B...

Страница 13: ...13 STEP 13 For shipping purpose the Bolts Button Head M8xp1 25x12mm 119 and Lock Washers M8 90 are attached on the Upright Post 4 a Loosen and remove these 4 Button Bolts 119 and the 4 Lock Washers 90...

Страница 14: ...Bolts 120 and 4 Lock Washers 90 from the Stationary Handlebar 5 b Connect the Middle Pulse Sensor Wire 141 and the Lower Pulse Sensor Wire 142 to the wire in the Stationary Handlebar 5 c Install the...

Страница 15: ...e Battery Compartment cover 22 to the back of the Display Console 19 and secure it with the Screw M3x10mm 102 STEP 16 a Connect the Upper Pulse Sensor Wire 140 to the Middle Pulse Sensor Wire 141 b Co...

Страница 16: ...19 secure it with 4 Screws Round Head M5xp0 8x15mm 108 STEP 19 Remove the 2 Screws Round Head M5xp0 8x15mm 108 that attached to the Upright Post 4 Install the Water Bottle Holder 25 onto the Upright P...

Страница 17: ...olts Button Head M8xp1 25x16mm 120 and 4 Lock Washers 90 c Repeat the same procedure to install the Right Upper Handlebar 7 to the Right Pivot Arm 8R STEP 21 a Place the Front and Rear Pivot Arm Cover...

Страница 18: ...ay Console angle may be adjusted by pushing the A or B on the Display Console TRANSPORT YOUR ELLIPTICAL TRAINER SAFELY Lift up the front end of the machine by grip and hold the Front Stabilizer 2 with...

Страница 19: ...AND REPLACE BATTERIES Loosen the Screw 83 at the bottom on the Console Bracket 14 Loosen the Screw M3x10mm 79 that locks the battery cover Install or Replace only the Nickel Metal Hybrid NI MH rechar...

Страница 20: ...r Right Side Cover 1 18 Main Frame Base Cover 1 19 Console 1 20 Console Bracket 1 21 Console Lower Case 1 22 Battery Door 1 23 Front Decorating Upright Cover 1 24 Upright Sleeve 1 25 Accessory Tray 1...

Страница 21: ...49 End Cap 50x100mm 4 50 Pulley 120mm 1 51 Pulley 235mm 1 52 Magnet 1 53 Belt 864mm J8 1 54 Belt 914mm J8 1 55 Console Fixed Bracket 1 56 Front Aluminum Upright Cover 1 57 Back Aluminum Upright Cover...

Страница 22: ...8 94 Washer 6 19 2 0t 2 95 Washer 8 23 2 0t 3 96 Washer 8 30 2 0t 2 97 Washer 8 38 2 0t 4 98 Washer 10 23 2 0t 2 99 Washer 10 28 2 0t 2 100 Washer 21 30 1 0t 7 101 Hex Socket Cap Screw M8 1 25 10mm 2...

Страница 23: ...t M5 2 129 Nut M3 4 130 Nut M8 p1 25 4 131 Nylon Lock Nut M6 p1 0 2 132 Nylon Lock Nut M8 p1 25 6 2t 4 133 Nylon Lock Nut M8 p1 25 6 134 Nylon Lock Nut M10 p1 5 8t 16 135 Generator Wire 3pin 700mm 2 1...

Страница 24: ......

Страница 25: ...24 EXPLODED DRAWING...

Страница 26: ...25...

Страница 27: ...26...

Отзывы: