![TITEFLEX R105 Series Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/titeflex/r105-series/r105-series_assembly-procedure_1120094003.webp)
PRINTED
COPY
- NOT
UNDER
REVISION
CONTROL
TITEFLEX COMMERCIAL ASSEMBLY PROCEDURE
TITLE: R105/R115/R122/R144 SERIES MEDIUM PRESSURE HOSE
AP-33
ASSEMBLIES UTILIZING TK2 FITTINGS (ABRASIVE WHEEL)
Rev. G
PROPRIETARY DATA NOTICE TO ALL RECEIVING THIS DOCUMENT
The information contained in this document was developed at the private expense by Titeflex Commercial. The contents are deemed proprietary
and all patent rights are reserved. Any submission is in a spirit of confidence and acceptance is deemed to be an acknowledgment of the
confidential relationship. Information contained hereon not lawfully obtained from another source shall not be released, duplicated, used or
disclosed in whole or in part for any procurement of manufacturing purpose without the prior written permission of the president, Titeflex
Commercial.
Page
3
of
15
1.0
PURPOSE
To establish assembly instructions and inspection procedures for R105/R115/R122/R144
Series medium pressure extruded PTFE assemblies using TK2 fittings for assemblies cut
with an abrasive wheel.
2.0
DEFINITIONS
N/A
3.0
ASSOCIATED DOCUMENTS
CQP-830 Nonconforming Material Report and Control
CQP-833 Scrap Processing
CQP-835 Daily Scrap Reports
MES 246 McLUBE Dip Coating
4.0
PROCEDURE
4.1
General
4.1.1
Check the tooling for wear, cracks, and contamination.
4.2
Preparation of Hose
4.2.1
Select the appropriate R105, R115, R122 or R144 hose and calculate the
desired hose length by subtracting the fitting deduct length of both end
fittings.
4.2.2
Wrap the area of the hose to be cut with a single layer of reinforced
packing tape or masking tape. Note: This step may be omitted for sizes 4,
5 and 6 hose.
4.2.3
Measure with a tape measure or other suitable device and cut hose (See
Figure #1) to the predetermined length. Use a cutoff wheel or other
suitable device. Ends must be cut clean and approximately square.