TitanTIG 200 DC Pulse
Pro
Operators Manual
Issue. A 0516
6.0
Maintenance
The utilization level of the power source and its working environment should be taken into consideration
in planning the frequency of maintenance of the machine. Appropriate use and preventive maintenance
guarantee the trouble-free use of the equipment. This allows you to avoid interruptions in use and
increases the productivity of the machine.
6.1 Cables
Check the condition of welding and mains cables daily. Do not use damaged cables. Also make sure that all
extension cables used in the mains connection are in proper condition and compliant with regulations.
NOTE!
The mains cables may be repaired and installed only by electrical contractors and installers
authorized to perform such operations.
6.2 Power source
Before cleaning the interior of the machine, you need to remove the case by unscrewing the mounting
screws at the top and sides of the machine.
NOTE!
To prevent damage, wait approximately two minutes after disconnecting the mains cable before
removing the machine’s case. Perform the following cleaning and maintenance at least every six months:
1. Clean the interior of the machine and the fan grill’s net of any dust and stains – for
Example, with a soft brush and vacuum cleaner.
•
Do not use pressurized air. The stain may become compressed into the grooves of the coolers.
•
Do not use a pressure-washing device.
2. Check the electrical connections of the machine. Clean any oxidized connections, and tighten the
loosened ones.
•
Check for the right tension before you start repairing the connections.
NOTE!
Remember that the machine may be repaired only by an electrical contractor or installer
authorized to perform such operations.
6.3 Regular maintenance
Authorized service agents perform regular maintenance by agreement. Tasks included in regular
maintenance:
Cleaning Equipment
Inspection and maintenance of the welding gun.
Checking of connectors, switches, and control knobs.
Checking electrical connections.
Checking the mains cable and plug
Replacement of damaged or worn parts.
Calibration testing, with adjustment of the functions and operational values of the machine, if
necessary
Содержание 200 DC PULSE PRO
Страница 2: ...TitanTig 200 DC Pulse Operators Manual Issue A 0516 ...
Страница 41: ...TitanTIG 200 DC Pulse Pro Operators Manual Issue A 0516 7 0 Electrical principle diagram ...
Страница 46: ...TitanTIG 200 DC Pulse Pro Operators Manual Issue A 0516 ...
Страница 47: ...TitanTIG 200 DC Pulse Pro Operators Manual Issue A 0516 ...