LE940B6 HW User Guide
Rev. 2.02
Page 41 of 111
2020-01-10
PAD
Signal
Notes
AH19
C103/TXD
If not used, connect to a test
point
AF19
C104/RXD
If not used, connect to a test
point
AA18
C105/RTS
If flow control is not used,
connect to GND
AK19
C106/CTS
If not used, connect to a test
point
AB19
TXD_AUX
If not used, connect to a test
point
AD19
RXD_AUX
If not used, connect to a test
point
AD1
ANT_1
If not used, connect to a
50 Ohm termination
AU9
ANT_DIV_1 If not used, connect to a
50 Ohm termination
S1
ANT_GPS
If not used, connect to a
50 Ohm termination
E4, F3, F5, G2, H3, J2, K3, L2, M3, L4,
N4, R4, T4, V4
For
Analysis
Recommended to connect to
test points for analysis
Provided
to
Dekra
under
NDA
Distribution
is
Prohibited
except
for
Dekra
employees
with
a Need
to
know