12
Fig. E
Fig. E
SLACK
SAFETY PIN
All cables MUST remain in sheave grooves. Before lift start-up,
check all of the cables for proper routing.
11) After routing the Cables double-check to make sure all are properly positioned and
REMAIN WITHIN THE GROOVES of ALL pins. (See Fig. E)
POWER UNIT INSTALLATION
ROUTING HYDRAULIC HOSE
LIFT START UP / FINAL ADJUSTMENTS
12) Mount the POWER UNIT to the Mounting Bracket using the M8 Hex Bolts and nuts
(torque to 35-45 PSI) then FILL THE RESERVOIR with 20-quarts of premium quality ISO-
32, AW-46 Hydraulic oil.
13) Install the hydraulic fittings to the power unit and base end of the cylinder under
runway, run the power unit hose through the front crossbeam tube to the cylinder base.
(refer to Fig. F)
NOTE:
BE SURE THAT THE HOSE IS CLEAR OF MOVING PARTS.
14) Be sure to grease all (6) zerk fittings. (See Fig. G)
Fig. F
Hydraulic
Fitting
Hose
Fig. G
Содержание HD4P-12000
Страница 27: ...23 LIFT WILL NOT RAISE...
Страница 28: ...24 MOTOR WILL NOT RUN...
Страница 29: ...25 LIFT WILL NOT STAY UP...
Страница 30: ...26 WILL NOT RAISE LOADED LIFT...
Страница 31: ...27 LIFT LOWERS SLOWLY OR NOT AT ALL...
Страница 32: ...28 8 DIAGRAMS PARTS LIST FIG 1 85...
Страница 33: ...29 FIG 2 106 105 86 87 86 87 86 87 102 101 85 100 96 95 94 103 104 97 98 99 91 92 93 88 89 86 87 86 87 89 90...
Страница 34: ...30 FIG 3 1 2 3 33 34 26 27 32 32 1 34 4 34 3 34 2 34 1 28 29 30 31 5 2 16 6 7 8 9 10 11 12 13 14 15 4...
Страница 35: ...31 FIG 4...
Страница 36: ...32 FIG 5...
Страница 40: ...36...
Страница 42: ...NOTES...
Страница 43: ...NOTES...