background image

Page 4

Installing Impression Rail

 Express

Aluminum Posts

Dia. #4

2

Cap

Square Post

Post Base Plate 

Vinyl Cover
*Do not install until 

railing assembly is 

completed.

Deck Edge

Joist 

Stringer

2x6 Blocking

2x6 Cross 

Block

Shims 

below 

base

2x6 Blocking

4X 3/8"x6" construction lag 

screws (sold separately)
*Verify local code 

requirements for post 

attachment hardware.

Dia. #3B

(SIDE VIEW)

Dia. #3A

(TOP VIEW)

How to Secure 3" Posts to Deck

•  Install proper post blocking 

(Dia. #3A & 3B)

Use proper attachment screws or anchors 

shown in diagram. (Hardware for post 

attachment are not provided with the posts.)

•  With 3/16″ drill bit, pre-drill through deck 

boards and into blocking. 

(Dia. #3C)

•  Drill a 5/8" hole in center of four deck screw 

holes for lighting wires (optional).

•  Level and plumb post using shims.
•  Secure posts to deck frame with suggested 

screws. 

(Dia. #3B)

*Verify local code requirements for post 

attachment hardware.

•  Install post caps (after panels are installed). 

(Dia. #4)

Pre-drill 3/16" holes for 

post attachment fasteners 

(sold separately).
5/8" hole for lighting wires 

(optional)

Dia. #3C

(TOP VIEW)

Determine All Posts Needed and Prepare 
(end, center or corner)

 

Important Note:

3" posts are required to reach 6' and 8' lengths. 2" posts must 

be set in-line to panel. 

Do not install post caps and vinyl 

post base covers until railing assembly is completed.

Install Lower Deck Rail Clips – Two Options: 

 

Option A - When No Installation Jig Is Available

•  Measure 2 7/8" from top of casting shoulder and place a pencil 

mark for location of the top edge of the rail clip. 

(Dia. #1)

•  Center clip on post and secure with (2) - #8x3/4" self-drilling 

screws. Clips are included in the Panel Kits.

Option B - Using Installation Jig 

(Sold separately. Accessory 

pack includes Installation Jig and Touch-up paint.)
•  Place Installation Jig (w/arrow facing base plate) on top of 

base plate upper edge. 

(Dia. #2)

•  Place clip in hole and fasten with (2) - #8x3/4" self-drilling 

screws. Clips are included in the Panel Kits.

1

Dia. #1

Rest 

Installation Jig 

on Base Plate 

– Arrow Down
Place Clip in 

hole, hold clip 

firmly while 

installing (2) 

Self-Drilling 

Screws. 

Dia. #2

Содержание Impression Rail Express

Страница 1: ...Impression Rail Express Installation Guide Aluminum Posts 4 Level Panels 8 Stair Panels 11 TimberTech com Open Mid Rail...

Страница 2: ...ded below The AZEK Co LLC accepts no liability or responsibility for the improper installation of this product Impression Rail Express may not be suitable for every application and it is the sole resp...

Страница 3: ...IRING MUST BE INSTALLED PRIOR TO SECURING POSTS TO DECK STAIR SURFACE AND INSTALLING TOP RAIL SNAPS It is the responsibility of the installer to meet all local code requirements and obtain all require...

Страница 4: ...led Dia 4 Pre drill 3 16 holes for post attachment fasteners sold separately 5 8 hole for lighting wires optional Dia 3C TOP VIEW Determine All Posts Needed and Prepare end center or corner Important...

Страница 5: ...gap between post and wall to be less than a 4 opening Dia 6 Install 90 degree Corner Posts Position post on same 3 centerline typical and temporarily fasten using a single fastener through base plate...

Страница 6: ...Dia 10 PLAN VIEW CLOSE UP VIEW CENTER LINE Install 45 Corner Posts Post to be installed at 22 5 to accommodate a 45 angle Position post on same 3 centerline typical and temporarily fasten to deck surf...

Страница 7: ...Screws Dia 12C 12D Repeat for lower clips Install base plate vinyl cover only after railing assembly is completed Dia 4 8 9 Dia 11 3 CENTERLINE TYPICAL DECK EDGE Secure 2 Posts to Deck center only For...

Страница 8: ...nels Clamp or hold panel against post adjust for equal end spacing Dia 1 Determine the desired center of the rail either a baluster hole or between two baluster holes Dia 2 Measuring from the determin...

Страница 9: ...IL 4X 8 X 3 4 TEK SCREW STRAIGHT CLIP EMBLED AND FASTENED IN ACCORDANCE WITH ULTRALOX S INSTALLATION INSTRUCTIONS ARE BLACK WHITE BRONZE REVISIONS BALLOONS DENOTE CHANGES REV DESCRIPTION DATE APPROVED...

Страница 10: ...G SCREWS POST RAIL PANEL CLIP 2 POST DETAIL CROSSOVER BRACKET 4X BASE MOUNTING SCREWS MOUNTING STRUCTURE 2 POST 2 POST BASE 2 BASE SKIRT Wall Mounts optional Use Wall Mounts if attaching level railing...

Страница 11: ...etween two baluster holes Dia 1C Measuring from the determined center cut both ends of the rails Position stair panel approximately 1 1 2 above stair nosing Tip lay a 2x4 board flat on nose of stair t...

Страница 12: ...SELF DRILLING SCREWS OUTSIDE INSTALL 2X 8 X 3 4 SELF DRILLING SCREWS Dia 5 Dia 6 3 Secure Stair Panel To 3 Posts Once the stair panel attach clips have been installed re attach the lower 3 post to th...

Страница 13: ...1 16 less than opening size Clean cut areas and apply touch up paint on exposed ends Snap each rail snap over the corresponding rail channel until properly seated Dia 8 34 to 38 from stair nosing to...

Страница 14: ...ia 11 4X 8 X 3 4 SELF DRILLING SCREWS 3 POST DETAIL 3 X 3 POST CAP MOUNTING STRUCTURE 4X BASE MOUNTING SCREWS 3 POST BASE RAIL PANEL CLIP DETAIL RAIL PANEL BOTTOM RAIL WALL MOUNT 2X WALL MOUNTING SCRE...

Страница 15: ...or building codes The consumer assumes all risks and liability associated with the construction or use of this product The consumer or contractor should take all necessary steps to ensure the safety...

Страница 16: ...TimberTech com AZEK Building Products 1330 W Fulton Market Suite 350 Chicago IL 60607 2019 AZEK Building Products All Rights Reserved...

Отзывы: