background image

Page 11

Installing Impression Rail

 Express

Open Mid-Rail Stair Panels

UPPER BOTTOM SNAP

LOWER

BOTTOM SNAP

STAIR

PANEL

STAIR PANEL

ATACH CLIPS

UNPUNCHED H-CHANNEL

AND TOP SNAP

3” POST KIT

Important Notes:

•  Actual Stair Panel Lengths: 6' Panels = 

69.43" and 8' Panels = 91.31". 3″ posts are 

required to reach 6' and 8' lengths.

•  Stair railing panels are shipped at a  

37 degree angle. Panels are adjustable  

+/- 3 degrees.

•  Maximum post spans on stair railing 

application is 96" on center. Additional posts 

are required on any stair application more 

than 8' in length.

•  For all other applications, consult a design 

professional or an Impression Rail

®

 Express 

representative for more information.

Dia. #1A

Dia. #2

1

Fit Stair Railing Panels

•  Position stair railing panel alongside 3" top 

stair post and temporarily installed 3" bottom 

post. 

(Dia. 1A)

•  Determine the desired center of the rail: 

either a baluster hole or between two 

baluster holes. 

(Dia. 1C)

•  Measuring from the determined center, cut 

both ends of the rails.

•  Position stair panel approximately 1 1/2" 

above stair nosing. 

Tip: lay a 2x4" board 

flat on nose of stair treads. This will allow 

enough room for installation of bottom 

snap.

 Clamp stair panel against top and 

bottom 3" posts. Using a sharp #2 pencil, 

mark the stair channels at four (4) locations.

•  If using a continuous top rail, after panel has 

been clamped to post, mark cut lines on the 

H-channel and the 2" post using the bottom 

of the H-channel to find your angle for post 

cut. 

(Dia. 1B)

 

•  Remove clamps and cut stair panel at all four 

(4) locations. 

(Dia. 2)

 Take care to cut stair 

channels at appropriate stair angle. Use of 

Miter saw with a sharp non-ferrous blade is 

recommended.

•  Clean cut areas and apply touch-up  

paint on all exposed ends.

4x cut 

panel

to fit 

4x cut

panel

to fit 

Stair railing 

panel

Temporary clamp 

panel against 

posts and mark 

for miter cuts  

TIP: Lay a 

2” x 4” board on 

nose of stair treads 

Level post

Temporarily

Installed Post

Dia. #1C

Centerline

Even number of balusters

Dia. #1B

Содержание Impression Rail Express

Страница 1: ...Impression Rail Express Installation Guide Aluminum Posts 4 Level Panels 8 Stair Panels 11 TimberTech com Open Mid Rail...

Страница 2: ...ded below The AZEK Co LLC accepts no liability or responsibility for the improper installation of this product Impression Rail Express may not be suitable for every application and it is the sole resp...

Страница 3: ...IRING MUST BE INSTALLED PRIOR TO SECURING POSTS TO DECK STAIR SURFACE AND INSTALLING TOP RAIL SNAPS It is the responsibility of the installer to meet all local code requirements and obtain all require...

Страница 4: ...led Dia 4 Pre drill 3 16 holes for post attachment fasteners sold separately 5 8 hole for lighting wires optional Dia 3C TOP VIEW Determine All Posts Needed and Prepare end center or corner Important...

Страница 5: ...gap between post and wall to be less than a 4 opening Dia 6 Install 90 degree Corner Posts Position post on same 3 centerline typical and temporarily fasten using a single fastener through base plate...

Страница 6: ...Dia 10 PLAN VIEW CLOSE UP VIEW CENTER LINE Install 45 Corner Posts Post to be installed at 22 5 to accommodate a 45 angle Position post on same 3 centerline typical and temporarily fasten to deck surf...

Страница 7: ...Screws Dia 12C 12D Repeat for lower clips Install base plate vinyl cover only after railing assembly is completed Dia 4 8 9 Dia 11 3 CENTERLINE TYPICAL DECK EDGE Secure 2 Posts to Deck center only For...

Страница 8: ...nels Clamp or hold panel against post adjust for equal end spacing Dia 1 Determine the desired center of the rail either a baluster hole or between two baluster holes Dia 2 Measuring from the determin...

Страница 9: ...IL 4X 8 X 3 4 TEK SCREW STRAIGHT CLIP EMBLED AND FASTENED IN ACCORDANCE WITH ULTRALOX S INSTALLATION INSTRUCTIONS ARE BLACK WHITE BRONZE REVISIONS BALLOONS DENOTE CHANGES REV DESCRIPTION DATE APPROVED...

Страница 10: ...G SCREWS POST RAIL PANEL CLIP 2 POST DETAIL CROSSOVER BRACKET 4X BASE MOUNTING SCREWS MOUNTING STRUCTURE 2 POST 2 POST BASE 2 BASE SKIRT Wall Mounts optional Use Wall Mounts if attaching level railing...

Страница 11: ...etween two baluster holes Dia 1C Measuring from the determined center cut both ends of the rails Position stair panel approximately 1 1 2 above stair nosing Tip lay a 2x4 board flat on nose of stair t...

Страница 12: ...SELF DRILLING SCREWS OUTSIDE INSTALL 2X 8 X 3 4 SELF DRILLING SCREWS Dia 5 Dia 6 3 Secure Stair Panel To 3 Posts Once the stair panel attach clips have been installed re attach the lower 3 post to th...

Страница 13: ...1 16 less than opening size Clean cut areas and apply touch up paint on exposed ends Snap each rail snap over the corresponding rail channel until properly seated Dia 8 34 to 38 from stair nosing to...

Страница 14: ...ia 11 4X 8 X 3 4 SELF DRILLING SCREWS 3 POST DETAIL 3 X 3 POST CAP MOUNTING STRUCTURE 4X BASE MOUNTING SCREWS 3 POST BASE RAIL PANEL CLIP DETAIL RAIL PANEL BOTTOM RAIL WALL MOUNT 2X WALL MOUNTING SCRE...

Страница 15: ...or building codes The consumer assumes all risks and liability associated with the construction or use of this product The consumer or contractor should take all necessary steps to ensure the safety...

Страница 16: ...TimberTech com AZEK Building Products 1330 W Fulton Market Suite 350 Chicago IL 60607 2019 AZEK Building Products All Rights Reserved...

Отзывы: