D-Box User's Manual
English
7 / 64
tiko Energy Solutions AG
IM-0007-0006 Rev. 5
Step 10
In your kit is shipped along an air-sealed bag with a solution to
fix the
D-Box onto the wall
without drilling holes for screws and dowels. This
can be velcro patches, double tape, or a combination of both.
Open the sealed bag and
place the patches onto the D-Box and socket
at the positions indicated in
IMAGE 10
.
Remove
the
protection
foils and
push the D-Box onto the wall
at the
desired location. Refer to
IMAGE 6
for optimal locations. Hold it for sev-
eral seconds.
The D-Box should now stay in place. If it seems loose, the glue on the
patches has been dried out due to bad storage conditions. Contact your
reseller to obtain fresh patches.
The glue of the patches needs to dry for at least for 24
hours before reaching full strength. Do not unplug or move
the D-Box during this time.
Step 11
Lift the heater back to its hooks.
Step 12
Power on the system
by enabling power in the electrical panel. Config-
ure the heater to the hottest possible level/temperature.
Step 13
To
finalize the installation
, all tiko devices must be configured using the
installation app
. Remind that to each room with one or multiple D-Boxes
belongs a temperature sensor (REF: CASTH-01.1004-01).
Operation
Device Operation
There are two functions assigned to the button:
•
Short press
(min. 1 sec., less than 5 sec.)
–
test communication quality to the
Gateway
. For the description of the LED, see section
LED Explanation
.
•
Long press
(more than 5 sec.)
–
Heater test. For details, please refer to the sec-
tion
Heater Test
.
The D-Box is subject to the control of the full system and operated by the Data Center
through the Gateway (M-Box). No user interaction is required.