68
SHB10 TIKI
F3
5
6
4
2
3
1
2
1
5
6
4
2
3
1
KVR
Wyłącznik
różnicowoprądowy RCD
10
SHB10
SHB10
EB14
Z
ewnętrzny kabel
grzejny
AA23-X1
X1
AA2-X1
F3
PE
PE
N
N
N
L
L
L
HYDRAULIC CONNECTION
ELECTRICAL CONNECTION
The KVR 10 accessory is used to safely drain off most
of the condensate from the air/water heat pump to a
frost-free collection point.
For information on hydraulic connection of the KVR 10
accessory, see the instructions for the KVR accessory.
Length
(m)
P
tot
(W)
Fuse (F3)
Part no.
1
15
T100mA/250V
718 085
3
45
T250mA/250V
518 900*
6
90
T500mA/250V
718 086
*Fitted at the factory
Plates to be punched-out
Residual-current device RCD
In order to connect the electric KVR accessory:
1. Open the control panel and punch-out the
notched plates in the control panel casing under
the residual-current device.
Connecting the KVR accessory
2. Attach the residual-current device RCD.
3. Use fuse (F3) depending on the length of the
KVR cable in accordance with the below table.
4. Connect a residual-current device to terminal
AA2-X1 under terminal block 5(N) and 6(L).
5. Connect a residual-current device to terminal
AA23-X1 to terminal blocks 1(L) and 2(N).
6. Connect an external heating cable (EB14) to termi-
nal AA23-X1 to terminal blocks: 4 (PE), 5 (N), 6 (L).
Residual-current
device RCD
SHK 10
SHK 10
External heating
cable
Section 12 |
Accessories
Содержание SHB10
Страница 1: ...09 02 2021 30122 SHB10 TIKI Installation and User manual Indoor module for air to water split systems ...
Страница 2: ......
Страница 87: ......
Страница 88: ...TIKI HVAC d o o Partizanska cesta 12 3320 Velenje Email servis tiki si www TIKI si ...