HEAVY DUTY TIMBER
FLOOR
PANEL
HEAVY DUTY TIMBER
D
D
AG
AG
AF
BLANK SIDE
BLANK SIDE
DETAIL A
BLANK SIDE
BLANK SIDE
SCREW THROUGH
AH
DETAIL B
NAIL THROUGH
HEAVY DUTY TIMBER
FLOOR
PANEL
HEAVY DUTY TIMBER
TIGERFLEX PENT BIKE STORE -
ASSEMBLY GUIDE
1
FLOOR INSTALLATION & SIDE PANEL ASSEMBLY.
INSTALL HEAVY DUTY TIMBER AS SHOWN.
•
SECURE TO BASE USING 90mm SCREWS PROVIDED.
•
NOTE - MAKE SURE FIXINGS GO THROUGH FLOOR JOISTS.
•
2 SCREWS PER HEAVY DUTY TIMBER.
•
SECURE BLANK SIDES TO EACH OTHER IN CORNERS USING 2X 50mm
•
SCREWS PER JOIN. SEE DETAIL A.
SECURE PANELS TO FLOOR USING 65mm NAILS
•
NOTE - MAKE SURE FIXINGS GO THROUGH FLOOR JOISTS OR INTO
•
HEAVY DUTY TIMBER - SEE DETAIL B.