MAINTENANCE
Boom
Maintenance Section 4-27
©2015 Alamo Group Inc.
MAINTENANCE
BEARING INSTALLATION
1.
Press upper bearing cup into the spindle
housing.
2.
Turn the spindle housing over and press in
the lower bearing cup.
3.
Place the lower bearing cone in the bearing
cup. Next press the seal into the spindle
housing. The inner lip of the seal must be
DOWN, towards the bearing, so lubricant is
sealed inside the housing.
4.
Install the spindle in the housing. Lightly
press the spindle to seat the cone onto the
spindle.
5.
Support the bottom of the spindle and press
the upper bearing cone and bearing adjustment sleeve onto the spindle.
6.
NOTE: The spindle housing must turn freely when seating the bearing cone and sleeve.
7.
Press the two upper seals into the spindle housing. The inner lip of the seals must be UP, away from
the bearing, so excess lubricant can escape.
8.
Install the bearing adjustment nut (thin nut) so there is 1-1/6” clearance between the nut and the
sleeve. Install the jam washer, placing the tab into the key-way. Install the bearing lock nut (thin nut)
and hand tighten against jam washer and adjustment nut. See the following section for bearing
adjustment.
9.
Position the spindle housing horizontally with the drain hole oriented “up”. Grease through the zerk
with Tiger Spindle Lubricant (part number 06540000) until the grease purges from the drain hole.
10.
Install the plug into the drain hole.
BEARING ADJUSTMENT
1.
Clamp the bottom end of the spindle
securely in a vise so the spindle housing
turns freely.
2.
Position a magnetic base dial indicator on
the outer diameter of the spindle housing.
Locate the end of the dial indicator against
the flat end of the spindle shaft. The dial
indicator will now measure accurately
bearing end play.
3.
Tighten the bearing adjustment nut until
there is .012 inch movement when the
spindle housing is pried upward away from
the vise jaws.
4.
When there is .012 inch free play between
the spindle and housing, install the bearing lock nut (thick nut). Hold the adjusting nut securely and
tighten the lock nut to 300 ft. lbs. of torque.
5.
After the lock nut is tightened, there must be .001 inch to .003 inch of free play when lightly prying up
on the spindle housing.
If the end play is correct, .001 inch to .003 inch, bend tabs up on jam washer to prevent the lock nut from
loosening.
If the end play is NOT correct, loosen the lock nut and turn the adjustment nut as required and re-tighten the
lock nut. Repeat first part of step 5.
Содержание JD6 E Series
Страница 4: ......
Страница 6: ......
Страница 7: ...Safety Section 1 1 2015 Alamo Group Inc SAFETY SECTION ...
Страница 25: ...SAFETY BOOM Safety Section 1 19 2015 Alamo Group Inc SAFETY ...
Страница 26: ...SAFETY BOOM Safety Section 1 20 2015 Alamo Group Inc SAFETY ...
Страница 27: ...SAFETY BOOM Safety Section 1 21 2015 Alamo Group Inc SAFETY ...
Страница 28: ...SAFETY BOOM Safety Section 1 22 2015 Alamo Group Inc SAFETY ...
Страница 29: ...SAFETY BOOM Safety Section 1 23 2015 Alamo Group Inc SAFETY ...
Страница 31: ...Assembly Section 2 1 ASSEMBLY SECTION JD6xxxE BENGAL ...
Страница 48: ...ASSEMBLY Assembly Section 2 18 BOOM JOYSTICK DIAGRAM ASM C 0082A ...
Страница 56: ...ASSEMBLY Assembly Section 2 26 ...
Страница 57: ...Operation Section 3 1 2013 Alamo Group Inc OPERATION SECTION ...
Страница 78: ...OPERATION Boom Operation Section 3 22 2013 Alamo Group Inc OPERATION LEVER 4 BOOM SWIVEL LEVER 5 BOOM SHIELD ...
Страница 102: ...OPERATION Boom Operation Section 3 46 2013 Alamo Group Inc OPERATION ...
Страница 103: ...Maintenance Section 4 1 2015 Alamo Group Inc MAINTENANCE SECTION ...
Страница 110: ...MAINTENANCE Boom Maintenance Section 4 8 2015 Alamo Group Inc MAINTENANCE ...
Страница 132: ...MAINTENANCE Boom Maintenance Section 4 30 2015 Alamo Group Inc MAINTENANCE ...
Страница 134: ...MAINTENANCE Boom Maintenance Section 4 32 2015 Alamo Group Inc MAINTENANCE ...
Страница 135: ...PARTS SECTION JD6 BENGAL BOOM ...
Страница 137: ...PARTS ORDERING GUIDE 2016 Alamo Group Inc Parts Section 3 JD6XXXE BENGAL ...
Страница 138: ...TRACTOR MOUNT KIT 2016 Alamo Group Inc Parts Section 4 JD6XXXE BENGAL ...
Страница 142: ...COOLER MOUNT 2016 Alamo Group Inc Parts Section 8 JD6XXXE BENGAL ...
Страница 144: ...BOOM MOUNT KIT 2016 Alamo Group Inc Parts Section 10 JD6XXXE BENGAL ...
Страница 148: ...JOYSTICK AND SWITCHBOX MOUNT 2016 Alamo Group Inc Parts Section 14 JD6XXXE BENGAL ...
Страница 150: ...CABLE MANUAL LIFT VALVE 5 SPOOL 2016 Alamo Group Inc Parts Section 16 JD6XXXE BENGAL ...
Страница 152: ...5 SPOOL CABLE CONTROL MOUNT 2016 Alamo Group Inc Parts Section 18 JD6XXXE BENGAL ...
Страница 154: ...BATTERY RELOCATION 2016 Alamo Group Inc Parts Section 20 JD6XXXE BENGAL ...
Страница 158: ...POLYCARBONATE SAFETY WINDOW 2016 Alamo Group Inc Parts Section 24 JD6XXXE BENGAL ...
Страница 160: ...FIRE EXTINGUISHER OPTION 2016 Alamo Group Inc Parts Section 26 JD6XXXE BENGAL ...
Страница 162: ...BULKHEAD HYDRAULICS BOOM MOWER 2016 Alamo Group Inc Parts Section 28 JD6XXXE BENGAL ...
Страница 164: ...BULKHEAD DIAGRAM 2016 Alamo Group Inc Parts Section 30 JD6XXXE BENGAL ...
Страница 166: ...NOTES 2016 Alamo Group Inc Parts Section 32 JD6XXXE BENGAL ...
Страница 167: ...PARTS SECTION COMMON BENGAL BOOM T4 ...
Страница 168: ...Common Bengal T4 Parts Section NOTES ...
Страница 171: ...PARTS ORDERING GUIDE 2015 Alamo Group Inc Parts Section 6 5 COMMON BENGAL T4 ...
Страница 172: ...BOOM ASSY BENGAL 18 T4 2015 Alamo Group Inc Parts Section 6 6 COMMON BENGAL T4 ...
Страница 174: ...BOOM ASSY BENGAL STANDARD 22 T4 2015 Alamo Group Inc Parts Section 6 8 COMMON BENGAL T4 ...
Страница 176: ...BOOM ASSY HYD BENGAL 22 T4 2015 Alamo Group Inc Parts Section 6 10 COMMON BENGAL T4 ...
Страница 178: ...BOOM ASSY BENGAL EXT 24 T4 2015 Alamo Group Inc Parts Section 6 12 COMMON BENGAL T4 ...
Страница 180: ...BOOM ASSY HYD BENGAL 24 T4 2015 Alamo Group Inc Parts Section 6 14 COMMON BENGAL T4 ...
Страница 182: ...BOOMREST OPEN STOW 2015 Alamo Group Inc Parts Section 6 16 COMMON BENGAL T4 ...
Страница 192: ...ROTARY MOWER SPINDLE ASSEMBLY 2015 Alamo Group Inc Parts Section 6 26 COMMON BENGAL T4 ...
Страница 194: ...BOOM ROTARY PIVOT ASSEMBLY 2015 Alamo Group Inc Parts Section 6 28 COMMON BENGAL T4 ...
Страница 196: ...50IN FLAIL DRIVE ASSEMBLY 2015 Alamo Group Inc Parts Section 6 30 COMMON BENGAL T4 ...
Страница 200: ...50IN FLAIL MOWER ASSY PASS THROUGH KNIVES 2015 Alamo Group Inc Parts Section 6 34 COMMON BENGAL T4 ...
Страница 202: ...63IN FLAIL DRIVE ASSEMBLY 2015 Alamo Group Inc Parts Section 6 36 COMMON BENGAL T4 ...
Страница 204: ...63IN FLAIL MOWER ASSEMBLY 2015 Alamo Group Inc Parts Section 6 38 COMMON BENGAL T4 ...
Страница 206: ...BOOM FLAIL PIVOT ASSEMBLY 2015 Alamo Group Inc Parts Section 6 40 COMMON BENGAL T4 ...
Страница 213: ...NOTES 2015 Alamo Group Inc Parts Section 6 47 COMMON BENGAL T4 ...
Страница 218: ...FRONT HYDRAULIC PUMP 2015 Alamo Group Inc Parts Section 6 52 COMMON BENGAL T4 ...
Страница 220: ...50IN AND 60IN ROTARY MOTOR BREAKDOWN 2015 Alamo Group Inc Parts Section 6 54 COMMON BENGAL T4 ...
Страница 222: ...FLAIL MOTOR BREAKDOWN 2015 Alamo Group Inc Parts Section 6 56 COMMON BENGAL T4 ...
Страница 228: ...MANUAL LIFT VALVE SCHEMATIC 2015 Alamo Group Inc Parts Section 6 62 COMMON BENGAL T4 ...
Страница 230: ...ELECTRONIC LIFT VALVE SCHEMATIC 2015 Alamo Group Inc Parts Section 6 64 COMMON BENGAL T4 ...
Страница 233: ...BRAKE VALVE HYDRAULIC SCHEMATIC 2015 Alamo Group Inc Parts Section 6 67 COMMON BENGAL T4 ...
Страница 234: ...ELECTRICAL TROUBLESHOOTING GUIDE 2015 Alamo Group Inc Parts Section 6 68 COMMON BENGAL T4 ...
Страница 235: ...HYDRAULIC TROUBLESHOOTING GUIDE 2015 Alamo Group Inc Parts Section 6 69 COMMON BENGAL T4 ...
Страница 236: ...TROUBLESHOOTING 2015 Alamo Group Inc Parts Section 6 70 COMMON BENGAL T4 ...
Страница 237: ...TROUBLESHOOTING CONTINUED 2015 Alamo Group Inc Parts Section 6 71 COMMON BENGAL T4 ...
Страница 239: ...WARRANTY SECTION Warranty Section 7 1 ...
Страница 240: ... ...
Страница 244: ...Printed in USA Tiger Corporation ...