Hippo Roof Anchor

Step 4

Add a layer of counterweights ensuring the 
U-bolts protrude through the same holes as the 
previously added counterweights. 

Install counterweights one layer at a time.

Depending on your configuration, either a total 
of 12 or 16 counterweight bases make up the 
Hippo Anchor system.  

Step 5

Position the security bracket over the U-bolt.
Insert the security bracket “tab” into the Hippo base. 
If you are installing 12 counterweights the tab will go 
in the lower slot, if 16 counterweights use the top slot. 
Slide the security bracket down over the u-bolt.

Step 6

Install a nut on each of the U-bolts. Hand
tighten all nuts securely. Using tools may
result in over-tightening, possibly damaging
the system.

Repeat for the remaining counterweights.

Содержание Hippo Anchor 65219

Страница 1: ...5 000 lbs 22 2 kN The Hippo Counterweight Anchor must not be used in adverse weather conditions The roof surface must be free of frost snow standing water grease or oil or any other type of lubricati...

Страница 2: ...occurs The force of striking an object in a swing fall may cause serious injury or death Minimize swing falls by working as directly below the anchorage point as possible Do not permit a swing fall i...

Страница 3: ...System is determined by work conditions and maintenance As long as the product passes inspection criteria it may remain in service Service Only Tie Down or parties authorized in writing by Tie Down ma...

Страница 4: ...ed Place 4 counterweights near the Hippo Base one on each of the 4 sides Tilt each counterweight on its side and insert the U bolt from the bottom up through one of the two holes in each base Step 2 P...

Страница 5: ...a total of 12 or 16 counterweight bases make up the Hippo Anchor system Step 5 Position the security bracket over the U bolt Insert the security bracket tab into the Hippo base If you are installing...

Страница 6: ...and Design Requirements for Active Fall Protection Systems This certificate declares that the above standard s was met by the requirements of such standard s Testing was performed under normal operat...

Страница 7: ...est edge of the anchorage connector shall be located a distance from the unprotected edge that is at least 2 times the calculated distance that the anchorage connector will slide before the fall has b...

Страница 8: ...r be connected to each other A pre planned rescue procedure in the case of a fall is required The rescue plan must be project specific The rescue plan must allow for employees to rescue themselves or...