22
SME70-O-Manual-04-2020
—
Cables in the terminal box
Insert the signal cables for each sensor in the three fittings making them out of the junction box and
block the ends of the corrugated tube in the corrugated tube couplings.
—
Mounting the corrugated tube between the junction box and the UP cabinet - wall installation
• Drill a hole with a diameter of 25 mm in the lower side of the SME-UP cabinet and mount the corru-
gated tube couplings, the Nylon locknut M25 with flat gasket.
• Cut the remaining tube for connection between the junction box and the SME-UP cabinet and fix it
to the coupling at the bottom of the junction box.
• Insert the three signal cables into the tube between the junction box and the UP cabinet, taking
care to protect the connectors. Use, if necessary, a cable-guide probe and space the connectors
in order to limit the overall dimensions.
• Block the ends of the tube into the couplings previously installed on the SME-UP cabinet.
• Fix the tubes with suitable clamps (not supplied).
SME70-O
UP
Nylon corrugated tube coupling
Nylon locknuts M25
flat gasket
P1
P2
DN28 Nylon
corrugated tube
CVS-P-24-O RGDAT
support shelf
for sensors