![THORLABS PRO800 Series Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/thorlabs/pro800-series/pro800-series_operation-manual_1110711016.webp)
12 Getting Started
_________________________________________________________________________________
______________________________________________________________________________________________________
© 2012 Thorlabs
NOTE
The DIP-Switch is for service purpose only!
Do not change their settings!
For operation both switches must be in the right position!
2.5 First operation
Turn the unit on by means of the mains switch.
Via the 4mm banana jack of the chassis ground the external optical build-up can be
connected to ground potential, if required.
Some seconds after switching on the unit, the display must light up. The system boot
process may take around 15 sec, if the firmware version is 4.64 and higher. If no
display is shown after this time, please check line voltage and line fuse.
The PRO8xxx mainframe is ready to use immediately after turning on.
The rated accuracy of the plug in modules is reached, however, after a warming-up
time. For the individual warming up time of the modules please refer to the manuals
of the modules inserted.