0800 019 5899 [email protected]
11
Installation procedure
1. To remove the TSMEB cover, find a clean flat
surface and place the unit on its back. Remove
the 2 screws from the base of the unit with a
cross head screwdriver.
2. Using both your thumbs and forefingers, grip the
cover firmly along the bottom of the unit, and push
the cover slowly up to separate it from the body of
the unit.
3. Carefully remove the display PCB/LED plug from the
PCBA.
4. Mount the unit onto the wall. Refer to page 23 of
this manual for the mounting hole template and
page 5 for product dimensions.
5. The electricity supply cable must be brought through
the electric gland from the rear of the appliance.
Connect the supply L/N/E to the correct terminals.
6. Ensure the RCBO and the isolation switch supplying
the 240VAC electrical mains to the TSMEB are turned
OFF
.
7. Carefully replace the plug and cable connecting the
display PCB/LED indicator to the PCBA.
8. Connect a water pressure limiting valve (maximum 5.0 bar/72.5 psi/500 kpa) and shutoff valve.
9. Connect the water supply via the shutoff valve and pressure limiting valve to the inlet water connection (
BLUE
).
NOTE: Flush the cold water line before connecting to the unit.
10. Connect the hot water from the outlet water connection (
RED
).
11. Run water through the unit without power to ensure there are no leaks.
12. Switch ON the circuit breaker and isolation switch supplying the electric mains power to the unit and check if the
unit turns ON.
If the LED is slowly blinking
GREEN
, the unit is in standby mode and is ready for use.
Turning hot water on will initiate the heating process and hot water should exit from the point of use water outlet.
When the TSMEB is operating the LED will illuminate as fast blinking
GREEN
.