PELLING
9
2.4
Obligatory informing
Everyone who operates with the boiler must read the instructions before using it, in
particular, the chapter ’’Safety Instructions’’.
This applies especially to persons who occasionally work on a boiler, for example,
cleaning and maintaining boilers. This manual should always be kept near the installed
boiler.
Pay particular attention to the applicable local standards and guidelines. All
local laws must be respected during installation, as well as standards and
norms that are in force in the country where the boiler is installed even
though it is not listed in this manual.
The Installation can be carried out only by persons (service technicians) who
are trained/educated and have a license for this job.
The central heating system must be properly calculated and dimensioned.
The chimney should be calculated and made according to EN 13384-1. The
chimney must be thermally insulated to prevent condensation.
Storage of pellets can be done only in places that are dry and free from
moisture.
In certain countries, it is necessary to measure the emissions of gases by an
authorized person during the first commissioning.
2.5
Safety devices
Boiler is equiped with safety devices that in case of unexpected situations
stop the power supply and thereby stop the operation boiler.
Microprocessor control on the boiler:
Intervenes directly, turns off the boiler until
it cools down and shows an error on the display screen in case of a fan failure, failure
of the motor for auger, or the ignition.
Fuse F4A 250V:
Fast fuse, protects the boiler from large voltage changes of electricity
and short circuits inside the boiler.
Safety limiting thermostat (STB):
intervenes by breaking the circuit in the boiler
(automatically stops motor of the auger and exhaust gasses fan) if the boiler
temperature reaches the limit of 95°C.
Vacuum switch:
intervenes in case of low underpressure in burnerroom(open door,
chimney jammed).
Содержание Pelling 100
Страница 2: ...2...
Страница 16: ...PELLING 16 4 3 Schematic representation of the menu control By pressing button SET we enter general menu...
Страница 17: ...PELLING 17...
Страница 18: ...PELLING 18 Clock adjustments Clock adjustments can be done on following way...
Страница 20: ...PELLING 20 Flowchart 2 Flowchart 3 Flowchart 4...
Страница 37: ...PELLING 37 8 Connection options 8 1 Hydraulic schemes for connection...
Страница 38: ...PELLING 38...
Страница 39: ...PELLING 39...
Страница 40: ...PELLING 40...
Страница 43: ...PELLING 43...
Страница 47: ...PELLING 47 12 EU Label...
Страница 48: ...PELLING 48...
Страница 49: ...PELLING 49...