PELLING
41
8.2
Scheme for electric connection
Below the top cover there are connection terminal blocks for:
Power supply 230V, 50Hz
Circulation pump
Room thermostat
Hall sensor and the flue gas fan are already connected.
Terminal blocks
Power supply
The boiler needs to be connected to 230V, 50Hz (via separate fuse 10A).
Voltage changes greater than 10% can lead to malfunction of the product.
Incorrect grounding on the power supply may lead to defective operation that
can not be charged to the manufacturer.
Room thermostat
User has possibility to instal room thermostat in other room separate from the boiler.
Work og the boiler with thermostat connected to conection for room thermostat can
be different depending on activated function
STANDBY
. Connection for room
thermostat is overbridged (default factory settings) so it means that his contact is
closed.
Instalation and connection of the room thermostat should be performed only
by authorized personel.
Circulation pump
It is mandatory to connect the pump to the intended output. We recommend a high-
efficient pump. The maximum power of the pump that can be connected to the output
is 120W.
The installation and connection must be carried out by an authorized service
technician.
Содержание Pelling 100
Страница 2: ...2...
Страница 16: ...PELLING 16 4 3 Schematic representation of the menu control By pressing button SET we enter general menu...
Страница 17: ...PELLING 17...
Страница 18: ...PELLING 18 Clock adjustments Clock adjustments can be done on following way...
Страница 20: ...PELLING 20 Flowchart 2 Flowchart 3 Flowchart 4...
Страница 37: ...PELLING 37 8 Connection options 8 1 Hydraulic schemes for connection...
Страница 38: ...PELLING 38...
Страница 39: ...PELLING 39...
Страница 40: ...PELLING 40...
Страница 43: ...PELLING 43...
Страница 47: ...PELLING 47 12 EU Label...
Страница 48: ...PELLING 48...
Страница 49: ...PELLING 49...