1
Site Preparation
Workbench and Space Requirements
Thermo Scientific
TSQ 8000 Preinstallation Requirements Guide
3
Workbench and Space Requirements
Use the following guidelines to ensure you have enough space to set up the TSQ 8000 system.
See
Figure 1
and
Figure 2
for system orientation.
1. Ensure you have adequate workbench space for the system. Refer to the table below for
exact measurements of each component. Use the information in the table below to
configure the workbench. Be sure to leave 46 cm (18 in.) of extra space to the left of the
TSQ 8000 for performing maintenance. You will also need space near the instrument for
the monitor and keyboard.
2. Supply a 1-in. i.d. hose to the building exhaust air system, an oil mist filter, or other
scrubbing device. The pump exhaust contains carrier gas, solvents, analytes, and a small
amount of oil vapor. These materials may be flammable, poisonous, or corrosive. Do not
allow the exhaust from the foreline pump, which includes your analytes, to accumulate to
Table 2.
Workbench and Space Requirements
Instrument
Depth
Width
Height
Weight
cm
in.
cm
in.
cm
in.
kg
lbs
TSQ 8000
89
35
40
16
45
18
61
135
Foreline Pump
1
46
18
20
8 25
10
24
52
Computer
2
48
19
20
8
43
17
12
27
Monitor
2
16
7
46
18
32
13
4
8
Keyboard
2
23
9
46
18
5
2
1
2
TRACE 1300
60
24
44
17
45
18
35
3
77
3
TRACE 1310
67
26
44
17
45
18
35
3
77
3
AI 1310 Auto Injector
4
28
11
23
9
40
19
6
13
AS 1310 Autosampler
4
28
11
41
16
40
19
6
13
TriPlus RSH standard X axis
80
32
99
39
74
29
25
55
TriPlus RSH extended X-axis
80
32
135
53
74
29
27
60
TriPlus 300 Headspace
55
22
82
32
73
29
63
139
Direct Probe Controller
5
58
23
33
13
12
5
6
13
1
This item is placed on the floor under the system.
2
Dimensions vary per manufacturer.
3
Add 0.8 kg (1.8 lbs) for each injector/detector module.
4
Mounts on top of the TRACE 1300/TRACE 1310.
5
Mounts on top of the TSQ 8000.
Содержание TSQ 8000
Страница 1: ...TSQ 8000 Preinstallation Requirements Guide 1R120505 0001 Revision D April 2014 ...
Страница 4: ......
Страница 26: ......