![Thermo Scientific TriPlus RSH Скачать руководство пользователя страница 28](http://html.mh-extra.com/html/thermo-scientific/triplus-rsh/triplus-rsh_preinstallation-manual_1104848028.webp)
1
TriPlus RSH Site Preparation
Space and Load Requirements
4
TriPlus RSH Preinstallation Requirements Guide
Thermo Scientific
3. Allow at least 30 cm (12 in.) of clearance behind the GC. Before switching on TriPlus,
move the crossrails to verify the absence of obstacles.
4. Make sure you have at least 92 cm (3 ft.) of clearance above the system.
5. Make sure your workbench can support a TriPlus RSH system. Keep in mind, additional
instruments add to the total weight.
6. Ensure that your work area is stable and free of vibration from nearby equipment. The
system is a sensitive instrument.
GC TriPlus RSH Configuration
The main GC TriPlus RSH configurations are reported in
Table 3
:
Table 3.
GC TriPlus RSH Configurations (Sheet 2 of 2)
Configuration
TRACE 1300/1310 + TriPlus RSH
(Use TriPlus RSH with standard or extended X-axis)
TRACE GC Ultra + TriPlus RSH
(Use TriPlus RSH with standard or extended X-axis)
TRACE GC Ultra + TRACE GC Ultra + TriPlus RSH
(Use TriPlus RSH with standard or extended X-axis)
FOCUS GC + TriPlus RSH
(Use TriPlus RSH with standard or extended X-axis)
FOCUS GC + FOCUS GC + TriPlus RSH
(Use TriPlus RSH with standard or extended X-axis)
FOCUS GC + TRACE GC Ultra+ TriPlus RSH
(Use TriPlus RSH with standard or extended X-axis)
TSQ 8000 Series MS + TRACE 1300/1310 + TriPlus RSH
ISQ Series MS + TRACE 1300/1310 + TriPlus RSH
DSQ II MS + TRACE 1300/1310 + TriPlus RSH
ITQ MS + TRACE 1300/1310 + TriPlus RSH
TSQ MS + TRACE 1300/1310 + TriPlus RSH
(Use TriPlus RSH with standard or extended X-axis)