Thermo Scientific
TriPlus RSH Preinstallation Requirements Guide
1
1
TriPlus RSH Site Preparation
This chapter gives you the information you need to prepare your site for the installation of the
TriPlus RSH.
TriPlus RSH operates reliably under controlled environment conditions. Operating or
maintaining a system outside the specifications outlined in this guide might cause many
different types of system failures. The repair of such failures is specifically excluded from the
standard warranty and service contract coverage.
Contents
•
Writing Conventions for TriPlus RSH
•
Entrance Requirements
•
Space and Load Requirements
•
Power Requirements
•
Environment Requirements
•
Gas Equipment Requirements
•
Receiving Instruments
•
What Happens Next?
CAUTION
This guide does not includes the information to prepare your lab for the
installation of your gas chromatographic system. You can find all the instruction in the
Preinstallation Requirements Guide
of your GC system.
Note
In addition to the information in this guide, you must also obey the building and
safety rules and regulations for construction that apply in your area.