1
TriPlus 300 Headspace Site Preparation
Lighting Requirements
4
TriPlus 300 Headspace Preinstallation Requirements Guide
Thermo Scientific
Lighting Requirements
Use the following guidelines to check the lighting of your site:
1. Ensure that your work area is properly lit. You may need an overhead lamp to light your
work area.
2. You may need a small, high-intensity lamp when you clean the TriPlus 300 Headspace.
Power Requirements
This section provides details about the power requirements.
IMPORTANT
The dimensions reported in
are rounding-up for excess.
The dimensions are calculated considering the distances that must be left between the
units of the GC-GC/MS system:
•
1 cm
between a GC and a TSQ 8000 Series mass spectrometer
•
1 cm
between a GC and a ISQ Series mass spectrometer
•
5 cm
between a GC and a ITQ mass spectrometer
•
5 cm
between a GC and a DSQ II mass spectrometer
A distance of about
3/5 cm
between the GC-GC/MS system and the TriPlus 300 is left
for opening the top cover of the Main through the two lateral push-buttons.
The dimensions reported in
consider a distance of
5 cm
.
Table 3.
Overall Dimensions of the GC-GC/MS TriPlus 300 Headspace Configuration
Configuration
Depth
Width
Height
Mass
cm
in.
cm
in.
cm
in.
kg
lbs
TriPlus 300 Hea TRACE 1300
60
24
131
52
73
29
98
216
TriPlus 300 Hea TRACE 1310
67
26
131
52
73
29
98
198
TriPlus 300 Hea TSQ 8000 TRACE
1300/1310
89
35
172
68
73
29
158
348
TriPlus 300 Hea ISQ TRACE 1300/1310
69
27
168
66
73
29
143
315
TriPlus 300 Hea DSQ II + TRACE 1300/1310
68
27
174
69
73
29
143
315
TriPlus 300 Hea ITQ + TRACE 1300/1310
68
27
174
69
73
28
143
315
Содержание TriPlus 300
Страница 4: ......
Страница 12: ...Contents xii TriPlus 300 Headspace Preinstallation Requirements Guide Thermo Scientific ...