1
TriPlus 300 Headspace Site Preparation
Power Requirements
Thermo Scientific
TriPlus 300 Headspace Preinstallation Requirements Guide
5
Power Line
Electrical Specifications
Use the following guidelines to ensure your site is equipped with enough power to support the
system.
CAUTION
The power line and the connections between the instruments must maintain
good electrical grounding. Poor grounding represents a danger for the operator and might
seriously affect the instrument performance.
Do not connect the TriPlus 300 Headspace sampling system to lines feeding devices of a
heavy-duty nature, such as motors, UV lamps, refrigerators, air compressors, and other
devices that can generate disturbances.
Pay attention not to leave any cable connecting the sampling unit and the
chromatographic system or the power cord close to the GC hot air vents.
Occasionally, unacceptable quality in line power sources might adversely affect the
operation of the GC-GC/MS system. It is the user’s responsibility to correct line voltage
problems.
Specifying power conditioning equipment is a complex task that is best handled by a
company or consultant specializing in that field. Contact your Thermo Fisher Scientific
Field Service Engineer (FSE) for assistance in locating a power consultant.
Table 4.
System Power Requirements
Equipment
Maximum Power (W)
TriPlus 300 Headspace
1300
TRACE 1300/1310
2000
TSQ 8000 Series MS including foreline pump
1080
ISQ Series MS, including foreline pump
1200
DSQ II MS
700
ITQ MS
700
Computer *
400
Monitor *
25
* Power requirements vary by manufacturer.
Содержание TriPlus 300
Страница 4: ......
Страница 12: ...Contents xii TriPlus 300 Headspace Preinstallation Requirements Guide Thermo Scientific ...