5
Routine and Preventive Maintenance
Maintaining the ESI Probe
Thermo Scientific
Surveyor MSQ Plus Hardware Manual
59
2. Using the 2.5 mm Allen key, unscrew the M3 × 10 cap head stainless steel screw from the
probe clamp, and then remove the probe clamp and the locking plate. See
.
Figure 37.
Removing the probe clamp and locking plate
3. Using the front end of the probe clamp, unscrew the capillary retaining nut (adaptor) and
remove it from the ESI probe. See
.
Figure 38.
Removing the capillary retaining nut (adaptor)
4. Place a lint-free cloth on the workbench, and then gently shake the ESI capillary
(P/N FM102598), graphite ferrule (P/N 6070119), and PEEK tube insert
(P/N FM102591) assembly out of the ESI probe onto the cloth. See
M3 × 10, cap head
stainless steel screw
Probe
clamp
Locking
plate
Probe
clamp
Capillary retaining nut
(adaptor)